My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 02100 <br /> <br />SITE PREPARATION <br /> <br />PART 1 - GENERAL <br /> <br />1.01 SCOPE OF WORK <br /> <br />A. This Section covers clearing and grubbing of the construction site as specified <br />herein. <br /> <br />B. Clear and grub the area within the limits of construction as required. The <br />ENGINEER shall establish the length and width of the area to be cleared and <br />grubbed prior to the beginning of any work. <br /> <br />PART 2 - PRODUCTS (Not Used) <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 CLEARING <br /> <br />A. The surface of the ground for the area to be cleared and grubbed shall be <br />completely cleared, as indicated on the plans, as well other objectionable <br />obstructions resting on or protruding through the surface of the ground. However, <br />those trees that are designated on the plans to remain shall be preserved as <br />hereinafter specified. Clearing operations shall be conducted so as to prevent <br />damage to existing structures and installations, and to those under construction, so <br />as to provide for the safety of employees and others. Clearing for structures shall <br />consist of topsoil, vegetation and lime sludge removal. <br /> <br />3.02 GRUBBING <br /> <br />A. Grubbing shall consist of the complete removal of all stumps, roots larger than 1 <br />1/2 inches in diameter, matted roots, brush, timber, logs and any other organic or <br />metallic debris resting on, under or protruding through the surface of the ground to <br />a depth of 18 inches below the subgrade. All depressions excavated below the <br />original ground surface for or by the removal of such objects, shall be refilled with <br />suitable materials and compacted to a density conforming to the surrounding <br />ground surface. <br /> <br />B. In areas so designated, top soil, not muck shall be stockpiled. Topsoil so <br />stockpiled shall be protected until it is placed as specified. Any topsoil remaining <br />after all work is in place shall be disposed of by the Contractor in the manner <br />specified in Section 02221. <br /> <br />3.04 DISPOSAL OF CLEARED AND GRUBBED MATERIAL <br /> <br />A. The Contractor shall dispose of all material and debris from the clearing and <br />grubbing operation by shipping such material and debris and disposing such <br />material to a suitable location as required by the Engineer or the governmental <br /> <br />06/07 <br /> <br />02100-1 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.