My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3.03 <br /> <br />06/07 <br /> <br />BACKFILL AND FILL <br /> <br />A. Place specified soil material in layers to required subgrade elevations: <br />1. In excavations, use satisfactory excavated or borrow material. <br />2. Under grassed areas, use satisfactory excavated or borrow material. <br />3. Under walks and pavements, use subbase material, or satisfactory <br />excavated or borrow material, or combination of both. Place shoulders <br />along edges of subbase course to prevent lateral movement with <br />satisfactory excavated or borrow material. <br />4. Under steps, use subbase material. <br />5. Under building slabs, use drainage fill material. <br />6. Under piping and conduit, use subbase material where subbase IS <br />indicated under piping or conduit; shape to fit bottom 90 degrees of <br />cylinder. <br /> <br />B. Backfill excavations as promptly as work permits, but not until completion of the <br />following: <br />1. Acceptance of construction below finish grade including waterproofing <br />and perimeter insulation. <br />2. Inspection, testing, approval, and recording locations of underground <br />utilities. <br />3. Removal of shoring and bracing, and backfilling of voids with satisfactory <br />materials. <br /> <br />C. Remove vegetation, debris, unsatisfactory soil materials, obstructions, and <br />deleterious materials from ground surface prior to placement of fills. Plow strip, <br />or break-up sloped surfaces steeper than 1 vertical to 4 horizontal so that fill <br />material will bond with existing surface. <br /> <br />D. When existing ground surface has a density less than that specified for particular <br />area classification, break up ground surface, pulverize, moisture-condition to <br />optimum moisture content, and compact to required depth and percentage of <br />maximum density. <br /> <br />E. Place backfill and fill materials in layers of 8 in. loose depth for material <br />compacted by heavy compaction equipment, and 4 in. in loose depth for material <br />compacted by hand operated tampers. <br /> <br />F. Before compaction, moisten or aerate each layer as necessary to provide <br />optimum moisture content. Do not place backfill or fill material on surfaces that <br />are muddy, frozen, or contain frost or ice. <br /> <br />G. Place backfill and fill materials evenly adjacent to structures, without wedging <br />against structures or displacement of piping or conduit. Compaction equipment <br />used within 10ft. of buried walls and soil supported structures shall not exceed <br />2000 Ibs. <br /> <br />02200-4 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.