My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3.04 <br /> <br />3.05 <br /> <br />3.06 <br /> <br />06/07 <br /> <br />GRADING <br /> <br />A. Grading Outside Building Lines: Grade areas adjacent to building lines to drain <br />away from structures and to prevent ponding and as follows: <br />1. Finish to within not more than 0.10 ft. above or below required subgrade <br />elevations. <br />2. Walks: Shape surface to line, grade and cross-section, with finish surface <br />not more than 0.10 ft. above or below required subgrade elevation. <br />3. Pavements: Shape surface to line, grade and cross-section, with finish <br />surface 1/2 in. above or below required subgrade elevation. <br /> <br />B. Grading Surface of Fill under Building Slabs: Grade smooth and even, free of <br />voids, compacted as specified, and to 1/2 in. below required elevation. <br /> <br />FIELD QUALITY CONTROL <br /> <br />A. Contractor will engage soil testing and inspection service for quality control <br />testing during earthwork operations. <br /> <br />B. Allow testing service to inspect and approve subgrades and fill layers before <br />further construction work is performed. <br /> <br />C. If in opinion of Engineer, based on testing service reports and inspection, <br />subgrade or fills which have been placed below specified density, provide <br />additional compaction and testing at no additional expense to Owner. <br /> <br />CLEANING AND PROTECTION <br /> <br />A. Protect newly graded areas from traffic and erosion. Keep free of trash and <br />debris. <br /> <br />B. Repair and re-establish grades in settled, eroded, and rutted areas to specified <br />tolerances. <br /> <br />C. Remove excess excavated and waste materials, including unacceptable <br />excavated material, trash and debris, and legally dispose of it off Owner's <br />property. <br /> <br />END OF SECTION <br /> <br />02200-5 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.