My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Part 2 - Materials <br /> <br />2.01 Top Soil <br /> <br />A. In areas to receive turf, rough grade to allow for sod thickness in all areas to be <br />sodded, verify that soil contains enough organic matter to support and encourage <br />rooting of sod. Fill is to be fine, compacted satisfactory fill material with no rocks <br />larger than 2-inches. <br /> <br />B. Both surface and subsurface before and after fill operations shall be checked to <br />confirm that percolation/compaction levels meet the needs of the proposed <br />planting for that area. <br /> <br />Part 3 - Execution <br /> <br />3.01 Excavation <br /> <br />A. Excavate or fill where necessary to obtain subgrades, percolation and surface <br />drainage as required. <br /> <br />B. Materials to be excavated are unclassified. <br /> <br />C. Remove entirely any existing obstructions after approval by the Landscape <br />Architect's or Owner's Representative. <br /> <br />D. Remove from site and dispose of debris and excavated material not required. <br /> <br />3.02 Grading <br /> <br />A. The Contractor shall establish finished grades as shown on the Engineers <br />grading plans and Landscape Architects Aesthetic Grading Plans, and as <br />directed by Landscape Architect and/or Owner's Representative, including areas <br />where the existing grade has been disturbed by other work. <br /> <br />B. Finished grading shall be smooth, aesthetically pleasing, drain well and ready to <br />receive sod and other plant material to full satisfaction of Landscape Architect <br />and Owner's Representative. <br /> <br />3.03 Compaction <br /> <br />A. Compact each layer of fill in designated areas with approved equipment to <br />achieve a maximum density at optimum moisture, AASHTO T 180 - latest edition <br />at time of bid. <br /> <br />1. Under landscape area, compaction shall not exceed 85% of maximum <br />density. <br /> <br />B. No backfill shall be placed against any masonry or other exposed building <br />surface until permission has been given by the Owner's Representative, and in <br />no case until the masonry has been in place seven days. <br /> <br />C. Compaction in limited areas shall be obtained by the use of mechanical tampers <br />or approved hand tampers. When hand tampers are used, the materials shall be <br />deposited in layers not more than four inches thick. The hand tampers used <br /> <br />06/07 <br /> <br />02210-2 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.