My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3.02 <br /> <br />3.03 <br /> <br />3.04 <br /> <br />06/07 <br /> <br />the Owner. All pipe and fittings shall be thoroughly cleaned before laying, shall <br />be kept clean until they are used in the work, and when installed or laid, shall <br />conform to the lines and grades required. <br /> <br />LAYING PIPE AND FITTINGS <br /> <br />A. Pipe and fittings shall be installed In accordance with requirements of the <br />manufacturer. <br /> <br />B. All pipe shall be sound and clean before laying. When laying is not in progress, <br />including lunchtime, the open ends of the pipe shall be closed by watertight plugs <br />or other approved means. <br /> <br />C. As soon as the excavation is completed to the normal grade of the bottom of the <br />trench, immediately place screen gravel or crushed stone (where applicable) <br />bedding in the trench, and then the pipe shall be firmly bedded in this material to <br />conform accurately to the line and grade indicated on the he drawings. Blocking <br />under the pipe will not be permitted. Bedding shall conform with the detail <br />drawings. <br /> <br />D. When cutting pipe is required, the cutting shall be done by machine, leaving a <br />smooth cut as right angles to the axis of the pipe. <br />E. Unless otherwise specified, pipe shall be joined in accordance with the <br />manufacturer's requirements and in a safe and secure manner. Pipe joints shall <br />be kept to a minimum. Leaks in joints shall be repaired immediately. <br /> <br />CLEANING AND FLUSHING <br /> <br />A. The pipe shall be thoroughly cleaned of all foreign matter before installation. It is <br />the Contractor's responsibility to insure cleanliness of the pipe during installation <br />and backfilling. At the conclusion of the work, the Contractor shall thoroughly <br />clean all of the pipe, if necessary, by flushing with water. Debris cleaned from <br />the lines shall be removed from the lowest outlet. If, after this cleaning, <br />obstructions remain, they shall be removed. <br /> <br />INSPECTION <br /> <br />A. After the pipe is cleaned, the Engineer will examine the pipe for leaks. If <br />defective pipes or joints are discovered at this time, they shall be repaired by the <br />Contractor. <br /> <br />END OF SECTION <br /> <br />02613-3 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.