My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Solo Construction Corp.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Responses
>
Solo Construction Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 3:19:15 PM
Creation date
1/28/2011 3:19:09 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St.
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />JUL-12-2007 THU 08:59 AM CALVIN GIORDANO <br /> <br />FAX NO. 9549218807 <br /> <br />P. 02/09 <br /> <br />SECTION 00900 <br /> <br />Addendum NO.1 <br />to <br />Contract documents <br /> <br />CITY OF SUNNY ISLES BEACH <br />172NO STREET ROADWAY IMPROVEMENTS <br />CGA PROJECT NO. 03-4197 <br />CITY BID NO. 07-05-01 <br /> <br />To All Bidders: <br /> <br />Bidders for the above-referenced project shall take note of the following changes, <br />additions, deletions, clarifications, etc. to the Plans and Specifications, which in <br />accordance with the Contract Documents shall become a part of and have precedence <br />over anything shown or described otherwise. <br /> <br />IN THE CONTRACT DOCUMENTS: <br /> <br />1. Attached Pre-bid minutes to be added to contract documents. <br /> <br />2. Section 00300, Pages 00300-2, 00300-3 and 00300-4 to be replaced in its entirety. <br /> <br />3. In response to bidders RFI"S: <br />RFI from Development FL: <br />1) In the Drawings (Demolition Plans) ClOD and C101 shown about the Power <br />Poles to be relocated by Others, but in the Bid Schedule has the Item No. 12 <br />Relocate power/light poles? What is Correct? <br />Response: Pole removal will be undertaken by FPL. <br /> <br />2) Is there an Engineer Cost? <br />Response: Approximately 1 million <br /> <br />RFI from Tenex: <br />3) On sheet C200 of the bid set of Plans it indicates "Contractor to clean existing <br />well and structures, contractor to core exist. StTucture and connect Prop. 24" <br />RCP." We do not have a bid item, please indicate HOW SHALL WE PROCEED? <br />Response,' See attaclled revised Bid Schedule, additional items atllled. <br /> <br />All other documents, specifications, drawings, terms and conditions remain the same. <br /> <br />Bidders must acknowledge receipt of Addendum on Page 00300-6. <br /> <br />END OF SECTION <br /> <br />Final Version 6/07 <br /> <br />00900-1 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.