Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Professional General Engineering Consultant 3 -Relevant Experience <br /> <br />SR-824/Pembroke Road, FOOT District Four, Broward County, FL <br />Corridor improvements from University Drive to SW 62nd A venue, two (2) miles long in a <br />highly urbanized area. Community Awareness and Access Management Plans were prepared. <br />Additionally, the project included milling and resurfacing, median modifications, drainage <br />improvements, ADA improvements, driveway reconstruction, signalization upgrades, new <br />lighting installation and landscaping. <br /> <br />Traffic Engineering Consulting Services, City of Del ray Beach, Broward County, FL <br />McMahon Associates, Inc. was selected to provide general engineering consulting services to <br />the city. McMahon Associates, Inc. services were primarily associated with the traffic <br />engineering and traffic calming. These projects were issued on a task order as-needed basis, <br />and facilitated the continual improvement of the city's capital improvement plans. <br /> <br />SR-858/Hallandale Beach Boulevard, Dixie Highway to US-I, FOOT District Four, <br />Broward CountYI FL <br />Corridor improvements on SR 858 from U5-1 to Dixie Highway. The project included <br />developing the Resurfacing, Restoration, and Rehabilitation Report, Community Awareness <br />Plan, and conceptual designs for the initial plan of work. The design included minor <br />reconstruction, milling, and resurfacing, median modification, signalization upgrades, utility <br />and lighting relocation, and landscaping. The intersection at US-1 and SR-858 required <br />significant adjustments to the alignment along SR-858 to fix existing deficiencies. <br /> <br />SR-858/Hallandale Beach Boulevard, US-I to Three Islands Boulevard, FOOT District <br />Four, Broward CountYI FL <br />Corridor improvements on SR 858 from US-1 to Three Islands Boulevard. The project included <br />the design and installation of new lighting system, milling and resurfacing, and eliminating <br />existing encroachments within the horizontal clearance requirements for medians and border <br />areas. McMahon enhanced traffic operations by upgrading all left-turn lanes to current design <br />standards, coordinated access management issues with FDOT, evaluated the mid-block <br />pedestrian crossings, upgraded signing, signalization, and pavement markings to meet current <br />design standards. The technical duties McMahon performed for lighting involved designing, <br />preparing construction plans, and writing specifications for roadway lighting improvements, <br />including lighting calculations, pole locations, foundation design, as well as electrical circuit <br />calculations and power supply and distribution design. Data collection, highway capacity <br />software, synchro analysis, and corridor coordination were additionally performed. <br /> <br /><JM:~~:tf.},,!!Q,~ <br /> <br />Page 3014 <br />