My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A&P Consulting #8
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
A&P Consulting #8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 11:24:59 AM
Creation date
2/18/2011 11:24:29 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
P.E.
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />1: <br />I. <br />. <br />. <br />. <br />.0 <br /> <br /> <br />City of Sunny Isles Beach - Professional General Enaineerina Consultant <br />RFQ No: 07-07-01 Proposal Executive Summary <br /> <br />SECTION THREE - PROJECT MANAGER / CONTACT PERSON QUALIFICATIONS & <br />EXPERIENCE <br /> <br />,J-- <br /> <br />( ~- <br />Aiiii",.,.'..,... <br />-.~.. <br />~;~~. L <br />(~.;( ~ <br />{ I,' <br /> <br />A&P will utilize a staffing plan that implements effective coordination, timely <br />response to the City of Sunny Isles Beach needs, and adherence to schedule and <br />budget, thereby ensuring the completion of a successful project. The team leader <br />selected for this endeavor will be one of our principals, Mr. Carlos M. Gil-Mera, <br />P.E., who will serve as our Project Manager and main contact person on this <br />contract. As Project Manager he will be responsible for the technical design <br />elements of this project as well as the required coordination among the different <br />disciplines to ensure the timely completion of projects within the established <br />proposed schedule. Mr. Gil-Mera will act as the point of contact between APCTE, <br />and the City of Sunny Isles Beach. Mr. Gil-Mera is a registered Professional Engineer and a Registered <br />General Contractor in the State of Florida. He has more than twenty one years of experience working on <br />projects similar to the ones that will be part of this contract. His duties will include: Directing and <br />coordinating the development of construction documents, signing and sealing all pertinent design <br />documents, scheduling and assigning projects and tasks to members of the Design Team, coordinating <br />all engineering functions with permitting agencies and local municipalities, and provide technical <br />assistance and direction to all firm's employees assigned to this contract. Mr. Gil-Mera worked for <br />FDOT for fifteen years; he spent the last eleven years in the internal design office working on the <br />production of roadway plans including minor design and major reconstruction roadway projects. During <br />the last two years of his career at FDOT, he worked as District VI Roadway Design Project Manager <br />where he was the head of an Internal Design Team working on a large number of "RRR" and <br />reconstruction projects. As one of the principal of A&P, Mr. Gil-Mera has designed and managed <br />numerous Transportation Projects for Governmental and Private Clients. Mr. Gil-Mera is an active <br />member of the American Society of Civil Engineers, The Florida Engineering Society and the Cuban- <br />American Association of Civil Engineers where he is currently holding the Vice-President position. He <br />is a 1986 graduate of Florida International University with a Bachelor's Degree in Civil Engineering. <br />Mr. Gil-Mera will be fully committed to this Project. His cellular phone number is (305) 525-3915 and <br />his office number is (305) 592-7283. Mr. Gil's experience as a Project Manager includes the following <br />similar projects: <br /> <br />SR-997/ Krome A venue from SW 296th Street to US-I. City of Homestead. Florida <br />Client: Florida Department of Transportation, District VI <br />Contact Person: Adriana Manzanarez, P.E. <br />Contact Phone: (305) 470-5497 <br />Design Completed: On-Going (60%) <br />This project is part of the improvements identified in the Department's Krome Avenue Action Plans <br />approved by the Miami-Dade Metropolitan Planning Organization in March, 1999. This portion of <br />Krome Avenue is a north-south two-lane roadway that extends approximately 3.78 miles from US-l to <br />A vocado Drive, running through the center of Florida City and the City of Homestead in southern <br />Miami-Dade County. The corridor land use is primarily industrial in the Florida City section (S.W. 352nd <br />St to S.W. 328th Street/Lucy Street) and commercial in the City of Homestead section (S.W. 328th <br />Street/Lucy Street to S.W. 296th Street/Avocado Drive). The project consist of preparing Construction <br />Documents (plans and specifications) for the 3.78 mile segment of this urban corridor, including signing <br />& pavement markings, upgrading seven signalized intersections from span-wire to mast-arm, a new <br />signalized intersection, 0.5 mi of lighting, implementation of four traffic safety studies, implementation <br />of Access Management and compliance with ADA. <br /> <br />AI~T <br />1r.lImi'TII:lRS A&P Consulting Transportation Engineers, Corp. <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.