My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Misc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Misc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 10:02:18 AM
Creation date
3/10/2011 1:37:36 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Atlantic Isles Utility & Roadway Improv.
Bid No. (xx-xx-xx)
08-06-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTION 00300 <br /> <br />BID FORM <br /> <br />Bid of <br /> <br />Address <br /> <br />Phone <br /> <br />To furnish all materials, equipment and labor and to perform all work in accordance with <br />the Contract Documents for construction of: sanitary sewer collection system with <br />gravity sewer lines, manholes, WASD Lift Station and Force main; Paving, Grading, and <br />Drainage improvements; Under grounding of certain utilities, such as FPL Power, <br />CATV, and Telephone will require coordination with others. The installation of a new <br />water main with services is also proposed by the City of North Miami Beach to be <br />constructed contemporaneously, but not as a part of this contract located in the CITY <br />OF SUNNY ISLES BEACH. <br /> <br />To: CITY OF SUNNY ISLES BEACH <br />18070 Collins Avenue, Suite 250 <br />Sunny Isles Beach, Florida 33160 <br /> <br />The undersigned Bidder has carefully examined the Bidding Documents and the site of <br />the proposed work and is familiar with the nature and extent of the work and any local <br />conditions that may in any manner affect the work to be done. <br /> <br />The undersigned Bidder agrees to do all the work and furnish all materials called for by <br />the Bidding Documents, in the manner prescribed therein and to the standards of quality <br />and performance established by the Engineer for the unit price amounts stated in the <br />spaces herein provided, for each of the items or combination of items stipulated. Unit <br />price line items shall include cost of implementing all applicable safety requirements. <br />Bidder acknowledges that estimated quantities scheduled are approximated for the sole <br />purpose of obtaining comparative bids for determination of the lowest responsible and <br />responsive bidder whose bid best serves the interest of, and represents the best value <br />to, the Owner pursuant to the criteria set forth in Section 62-8 of the City Code, and that <br />actual quantities required may increase or decrease. Bidder further agrees that <br />payments will be made on the basis of actual quantities placed and accepted in the <br />construction. Bidder acknowledges that price is only a factor in determining the lowest <br />responsible and responsive bidder. <br /> <br />05/08 <br /> <br />00300-1 <br /> <br />05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.