My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ceres
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 08-07-01 Emergency Debris Clearing and Removal
>
Responses
>
Ceres
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2011 3:56:03 PM
Creation date
3/23/2011 3:46:12 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Emergency Debris
Bid No. (xx-xx-xx)
08-07-01
Project Type (Bid, RFP, RFQ)
RFP
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> <br />o <br /> <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br /> <br />Mandatory Pre-Proposal Conference Summary Minutes <br />Tuesday, July 29, 2008 at 10:00 a.m. <br /> <br />RFP No. 08-07-01, Emergency Debris Clearing and Removal Operations <br /> <br />Rick Conner, Public Works Director, opened the Pre-Proposal Conference, with self introductions by <br />staff and consultants. Mr. Conner reminded vendors to sign in as this is a mandatory pre-proposal <br />conference, and he noted that the Summary Minutes from today's meeting along with the sign-in <br />sheet will be posted on www.demandstar.com <br /> <br />Deadline for submission of bid documents is Tuesday, August 12, 2008 at 10:00 a.m. at which <br />time they will be publicly opened. Any additional questions are required to be in writing and may <br />be submitted up to seven (7) business days before the bid opening (Friday, August I, 2008). They <br />will be answered and posted on www.demandstar.com You may email them to Rick Conner at <br />rconner(a)sifl.net <br /> <br />o <br /> <br />The City's Consultant, Valarie Hoffman of Solid Resources, Inc. presented an overview of the <br />project. The Security Bonding Requirement that needs to be supplied with your submittal is 5%. <br />The general liability insurance is $5 Million, and automobile liability is $1 Million. This work is for <br />the clearing, removal, and disposal of debris that is within the jurisdiction of Sunny Isles Beach. The <br />regular contract is for vegetative, C&D, and what is placed at the curb side on public rights-of-way. <br /> <br />Additional/Alternate Tasks: There are other tasks listed that will be issued on an as-needed basis for <br />hazardous waste removal. There are additional tasks for clearing Federal aid roads: I) Sunny Isles <br />Boulevard; 2) A I A (Collins Avenue); and 3) William Lehman Causeway. These roads are under the <br />jurisdiction of the Florida Department of Transportation (FOOT), but should they not be able to clear <br />those in a timely manner, the City will be instructing you to also clear those main roadways into the <br />City in addition to all the other roadways in the City. There is also an alternate task for sand removal <br />should the need arise if there is a wash over of the roads. In the bid section there are some other <br />opportunities for you to bid on some of those should the need arise. <br /> <br />All the contract direct costs are laid out here in the proposal for your payroll, subs, materials, <br />equipment, rental, sales taxes, payments, and pennits and fees that you may need. The one exclusion <br />is your overhead and profit, bid your unit prices with your overhead and profit built in, they should <br />not be separate line items. <br /> <br />. <br /> <br />Timeframe: If there is inclement weather or any other stonn activities that come up that delay your <br />work, the City will work with you on an extension of time because there is a really important time <br />factor here. The proposal limits you to have all the debris removed within the City of Sunny Isles <br />Beach within 30 days, so you want to make sure that you are able to put enough personnel, resources, <br />and equipment on this job early to get everything done within that time frame. The RFP is based on <br />SASQ917757 Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.