Laserfiche WebLink
<br />- <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />o <br /> <br />SECTION 5 <br />PROJECT DESCRIPTION AND REQUIREMENTS <br /> <br />EMERGENCY DEBRIS CLEARING AND REMOVAL OPERATIONS <br /> <br />5.1. IUFOSE <br /> <br />This document coostitutes a Request for Proposal (RFP) from experienced finns to clear and remove and lawfully <br />dispose of disaster-generated debris (other than hazardous materials and household putresClble garbage) from pubflC <br />property and public rights-of-way in the City of Sunny Isles Beach, ROOda, immediately after a natural or man-made <br />OlSaster. The oojective of the RFP and Sltlsequent (X)I'ltracting ~ is to secure the services of an experiEn:ed Cortractor <br />who is capable of efficiently clearing and removing very large volumes of disaster-generated debris from a large area in a <br />timely and cost-effective manner and lawfully cisposing of all collected debris. The Contractor must be capable of <br />assembling, directing and managing a workforce that can complete the debris management operations in a maximum <br />of 30 days. The contract will be tor a tenn of three (3) years with two (2) options to renew this Agreement for one (1) <br />year each, with annual re-certification of the Contractor's capabUities for years two (2) through five (5). <br /> <br />'Nhile intended to cover debris management needs in any major disaster scenario, the primary focus is on the threat of <br />hurricane or tornado damage to the City. The planning standards used for this project are based on the anticipated <br />impacts of a Category 4 Hurricane. <br /> <br />5.2. BACKGROUND <br /> <br />5. 2.1. Introduction <br /> <br />The City of Sunny Isles Beach staff has developed a Debris Management Plan that describes the general <br />needs and apprta:hes for clearing, removing and olSpOSing of large voIlJ11es of debris after a major disaster. It <br />provides general infonnation on debris classifications, local hauling and disposal capabilities and capacities. <br />The plan provides general guidance for the Contractor and is available upon request. <br /> <br />The City of Sunny Isles Beach's disaster recr:Nery planning includes (X)I'lsiderations for clearing, removing and <br />disposing of the volumes and types of debris expected to be generated by a major cisaster such as a hurricane or <br />tornado. The planning approach is fonnulated in part on the concept of strategic pre-positioning of plans and <br />resources necessary for timely, coordinated response and recovery operations, incIudllJ clearing and removal of <br />debris fraT1 plblk: property and public rights-of-way throughout the City using Contractor work forces. <br /> <br />The City envisions the need for a single major Contractor to carry out the Debris Oearin9 and Removal work <br />throughout the City. The Contractor must have the capacity to manage a major workforce with multiple <br />Slilcontractors and to cover the expenses associated with a major recovery operation prior to initial City payment <br />and between subsequent payments, as well as the capacity to provide the necessary bonds and insurance. The <br />Contractor must also have an eslabIished management team, an established network of resources to provide the <br />necessary equipment and personnel, comprehensive debris clearing, removal and volume reOOdion operations <br />plans, and demonstrable experience in major disaster recovery projects. <br /> <br />The contract to be awarded win be a ple1XlSitioned contract that will be activated only in the face of an actual <br />clsaster or emergerq. /Js such, no ~ will acx:rue to the Contractor lJ1Iess and lIltil the contract is <br />activated either in anticipation of a natural or man-made cisaster or immedately after such disaster. <br /> <br />Potential Contractors are solely responsible for their own costs of developing the proposals associated with <br />this RFP. In addition, a Contractor who receives a pre-positioned contract for the work will be required to <br />participate in certain City-directed disaster recovery training and/or exercises, one (1) to two (2) days each year, <br />at no cost to the City. The pre-positioned contract will be for tenn of three (3) years with two (2) one (1) year <br /> <br />23 <br />