My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Phillips & Jordan
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 08-07-01 Emergency Debris Clearing and Removal
>
Responses
>
Phillips & Jordan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2011 4:15:19 PM
Creation date
3/25/2011 4:14:35 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Emergency Debris Clearing
Bid No. (xx-xx-xx)
08-07-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />n <br /> <br />SECTION 7 <br />PROPOSAL RESPONSE SHEET I QUALIFICATIONS I FEE SCHEDULE FORM <br /> <br />City of Sunny Isles Beach <br />18070 CoBins Avenue <br />Sunny Isles Beach, Rorida 33160 <br />RFP No. 08-07-01 for Emergency Debris Clearing and Removal Operations <br /> <br />The undersigned Proposer proposes and agrees, if this RFP is accepted, to enter into an agreement with The City of <br />Sunny Isles Beach in the form included in the Contract Documents to perform and furnish all Work as specified or <br />indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this RFP and in <br />accordance with the other terms and conditions of the Contract Documents. <br /> <br />7.1. The Proposer accepts all of the terms and conditions of the Advertisement or RFP and Instructions to <br />Proposers, including without limitation those dealing with the disposition of Bid Security. This proposal will remain <br />subject to acceptance for 90 days after the day of proposal opening. The Proposer agrees to sign and submit the <br />Agreement with the Bonds and other documents required by the RFP Requirements within ten (10) days after the <br />date of the City's Notice of Award. <br /> <br />7.2. In submitting this proposal, the Proposer represents, as more fully set forth in the Agreement, that: <br /> <br />7.2.1. Proposer has examined copies of all the Proposal Documents and of the following Addenda (receipt of all <br />which is hereby acknowledged.) <br />Addendum No. Dated: <br />Addendum No. Dated: <br />Addendum No. Dated: <br />Addendum No. Dated: <br /> <br />7.2.2. The Proposer has familiarized himselflherself w~h the nature and extent of the Contract Documents, Work, <br />site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, <br />performance, or furnishing of the Work. <br /> <br />7.2.3. The Proposer has studied carefully all reports and drawings of subsurface conditions and drawings of <br />physical conditions if applicable. <br /> <br />7.2.4. The Proposer has obtained and carefully studied (or assumes responsibility for obtaining and carefully <br />studying) all such examinations, investigations, explorations, tests and studies that pertain to the subsurface <br />or physical conditions at the site or otherwise may affect the cost, progress, perfonnance, or fumishing of <br />the Work at the Contract Price, within the Contract Time and in accordance with the other tenns and <br />conditions of the Contract Documents, and no additional examinations, investigations, explorations, tests, <br />reports or similar infonnation or data are or will be required by Proposer for such purposes. <br /> <br />7.2.5. Proposer has reviewed and checked all infonnation and data shown or indicated on the Contract <br />Documents with respect to existing above ground and underground utilities at or continuous to the site and <br />assumes responsibility for the accurate location of said above ground and underground utilities. No <br />additional examinations, investigations, explorations, tests, report or similar infonnation or data in respect of <br />said above ground or underground utilities are or will be required by Proposer in order to perfonn and <br />furnish the Work at the Contract Price, within the Contract Time and in accordance with other terms and <br />conditions of the Contract Documents. <br /> <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.