Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />" <br /> <br />7.11. SCHEDULE <br /> <br />7.11.1. Removal Operations: Must begin within 24 hours ~ receiving the NoIice-to-Proceed and be functioning at 100% of <br />capacity within 2 days. Removal may begin earlier if adequate disposal sites are available and properly <br />prepared. The City reserves the right to increase or decrease the scope of the removal activity as helshe deems <br />necessary to ensure effective management of the overal debris removaVdisposaJ operations. <br /> <br />7.11.2. Working Hours: Unless otherwise permitted by the City, wor1<ing hours for removal operations shaD be limited <br />to daylight hours. <br /> <br />7.12. EXTRA WORK <br /> <br />At the City's option, the scope of wor1< may be expanded to include Federal Aid System roadwyays, public parks, other <br />recreational areas, drainage structures, and channels. <br /> <br />7.13. UNT PRICE PER CUBIC YARD OR TON BASIS OF MEASUREMENT AND PAYMENT <br /> <br />7.13.1. Debris removal will be paid for on the basis of a unit price per cubic yard or by the ton for all debris loaded, <br />hauled, and dumped at an approved landfill. The un~ price per cubic yard or ton must include all sLt>sidiary costs, <br />including but not limited to labor, eql.ipment, fuel, maintenance, general administration, and overhead and profit. <br />Compensation will be based solely on the w1l1T1e of debris haUed as c:kx:umented by 001llIeted load tickets <br />adniistered and validated by City monitors. <br /> <br />7.13.2. The following conversion factors will be used to convert from Clbic yards to tons unless material is weighed at <br />certified scales, in which case, the net weight of the materials shall prevail: <br /> <br />· Mixed Debris - Vegetation and Construction & Demolition = 500 LBSICY or CY x 0.25 = Tons <br />· Yard Vegetation - Soft Wood = 333.33 LBSICY or CY x 0.167 = Tons <br />· Yard Vegetation - Hard Wood = 500 LBSlCY or CY x 0.25 = Tons <br />. Construction & Demolition = 1000 LBS/CY or CY x 0.5 = Tons <br />. Mulch = 1000 LBS/Cy or CY x 0.5 = Tons <br />· Regular Trash = 300 LBSlCY or CY x 0.15 = Tons <br />· Concrete = 2000 LBS/CY or CY x 1.0 = Tons <br />· Sand = 2600 LBS/CY or CY x 1.3 = Tons <br /> <br />42 <br />