My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2004 AlA <br /> <br />MASTERSPEC <br /> <br />08/04 <br /> <br />SECTION 01310 - PROJECT MANAGEMENT AND COORDINATION <br /> <br />PART 1 - GENERAL <br /> <br />1.1 RELATED DOCUMENTS <br /> <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 1 Specification Sections, apply to this Section. <br /> <br />1.2 SUMMARY <br /> <br />A. This Section includes administrative provisions for coordinating construction operations on <br />Project including, but not limited to, the following: <br /> <br />1. Coordination Drawings. <br />2. Administrative and supervisory personnel. <br />3. Project meetings. <br />4. Requests for Interpretation (RFIs). <br /> <br />B. Each contractor shall participate in coordination requirements. Certain areas of responsibility <br />will be assigned to a specific contractor. <br /> <br />C. Related Sections include the following: <br /> <br />1. Division 1 Section "Summary of Multiple Contracts" for a description of the division of <br />Work among separate contracts and responsibility for coordination activities not in this <br />Section. <br />2. Division 1 Section "Construction Progress Documentation" for preparing and submitting <br />Contractor's Construction Schedule. <br />3. Division 1 Section "Execution Requirements" for procedures for coordinating general <br />installation and field-engineering services, including establishment of benchmarks and <br />control points. <br />4. Division 1 Section "Closeout Procedures" for coordinating closeout of the Contract. <br /> <br />1.3 DEFINITIONS <br /> <br />A. RFI: Request from Contractor seeking interpretation or clarification of the Contract <br />Documents. <br /> <br />1.4 COORDINATION <br /> <br />A. Coordination: Coordinate construction operations included in different Sections of the <br />Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate <br />construction operations, included in different Sections, that depend on each other for proper <br />installation, connection, and operation. <br /> <br />PROJECT MANAGEMENT AND COORDINATION <br /> <br />01310 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.