Laserfiche WebLink
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />SECTION 01320 - CONSTRUCTION PROGRESS DOCUMENTATION <br /> <br />PART 1 - GENERAL <br /> <br />1.1 RELATED DOCUMENTS <br /> <br />A Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 1 Specification Sections, apply to this Section. <br /> <br />1.2 SUMMARY <br /> <br />A This Section includes administrative and procedural requirements for documenting the progress <br />of construction during performance of the Work, including the following: <br /> <br />1. Preliminary Construction Schedule. <br />2. Contractor's Construction Schedule. <br />3. Submittals Schedule. <br />4. Daily construction reports. <br />5. Material location reports. <br />6. Field condition reports. <br />7. Special reports. <br /> <br />B. Related Sections include the following: <br /> <br />L Division 1 Section "Summary of Multiple Contracts" for prepanng a combined <br />Contractor's Construction Schedule. <br />2. Division 1 Section "Payment Procedures" for submitting the Schedule of Values. <br />3. Division 1 Section "Project Management and Coordination" for submitting and <br />distributing meeting and conference minutes. <br />4. Division 1 Section "Submittal Procedures" for submitting schedules and reports. <br />5. Division 1 Section "Photographic Documentation" for submitting construction <br />photographs. <br />6. Division 1 Section "Quality Requirements" for submitting a schedule of tests and <br />inspections. <br /> <br />1.3 DEFINITIONS <br /> <br />A Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, <br />and controlling the construction project. Activities included in a construction schedule consume <br />time and resources. <br /> <br />1. Critical activities are activities on the critical path. They must start and finish on the <br />planned early start and finish times. <br />2. Predecessor Activity: An activity that precedes another activity in the network. <br />3. Successor Activity: An activity that follows another activity in the network. <br /> <br />CONSTRUCTION PROGRESS DOCUMENTATION <br /> <br />01320 - 1 <br />