Laserfiche WebLink
<br />Copyright 2002 AlA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />a. Project name. <br />b. Date. <br />c. Name and address of Architect. <br />d. Name and address of Contractor. <br />e. Name and address of subcontractor. <br />f. Name and address of supplier. <br />g. Name of manufacturer. <br />h. Submittal number or other unique identifier, including revision identifier. <br /> <br />1) Submittal number shall use Specification Section number followed by a <br />decimal point and then a sequential number (e.g., 06100.01). Resubmittals <br />shall include an alphabetic suffIx after another decimal point (e.g., <br />06100.01.A). <br /> <br />1. Number and title of appropriate Specification Section. <br />J. Drawing number and detail references, as appropriate. <br />k. Location(s) where product is to be installed, as appropriate. <br />1. Other necessary identification. <br /> <br />F. Deviations: Highlight or otherwise specifically identify deviations from the Contract <br />Documents on submittals. <br /> <br />G. Additional Copies: Unless additional copies are required for final submittal, and unless <br />Architect observes noncompliance with provisions in the Contract Documents, initial submittal <br />may serve as final submittal. <br /> <br />1. Submit one copy of submittal to concurrent reviewer in addition to specified number of <br />copies to Architect. <br />2. Additional copies submitted for maintenance manuals will be marked with action taken <br />and will be returned. <br /> <br />H. Transmittal: Package each submittal individually and appropriately for transmittal and <br />handling. Transmit each submittal using a transmittal form. Architect will discard submittals <br />received from sources other than Contractor. <br /> <br />1. Transmittal Form: Use AlA Document G810. <br />2. Transmittal Form: Provide locations on form for the following information: <br /> <br />a. Project name. <br />b. Date. <br />c. Destination (To:). <br />d. Source (From:). <br />e. Names of subcontractor, manufacturer, and supplier. <br />f. Category and type of submittal. <br />g. Submittal purpose and description. <br />h. Specification Section number and title. <br />1. Drawing number and detail references, as appropriate. <br />J. Transmittal number, numbered consecutively. <br />k. Submittal and transmittal distribution record. <br />1. Remarks. <br />ill. Signature of transmitter. <br /> <br />SUBMITTAL PROCEDURES <br /> <br />01330 - 3 <br />