My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AlA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />a. Project name. <br />b. Date. <br />c. Name and address of Architect. <br />d. Name and address of Contractor. <br />e. Name and address of subcontractor. <br />f. Name and address of supplier. <br />g. Name of manufacturer. <br />h. Submittal number or other unique identifier, including revision identifier. <br /> <br />1) Submittal number shall use Specification Section number followed by a <br />decimal point and then a sequential number (e.g., 06100.01). Resubmittals <br />shall include an alphabetic suffIx after another decimal point (e.g., <br />06100.01.A). <br /> <br />1. Number and title of appropriate Specification Section. <br />J. Drawing number and detail references, as appropriate. <br />k. Location(s) where product is to be installed, as appropriate. <br />1. Other necessary identification. <br /> <br />F. Deviations: Highlight or otherwise specifically identify deviations from the Contract <br />Documents on submittals. <br /> <br />G. Additional Copies: Unless additional copies are required for final submittal, and unless <br />Architect observes noncompliance with provisions in the Contract Documents, initial submittal <br />may serve as final submittal. <br /> <br />1. Submit one copy of submittal to concurrent reviewer in addition to specified number of <br />copies to Architect. <br />2. Additional copies submitted for maintenance manuals will be marked with action taken <br />and will be returned. <br /> <br />H. Transmittal: Package each submittal individually and appropriately for transmittal and <br />handling. Transmit each submittal using a transmittal form. Architect will discard submittals <br />received from sources other than Contractor. <br /> <br />1. Transmittal Form: Use AlA Document G810. <br />2. Transmittal Form: Provide locations on form for the following information: <br /> <br />a. Project name. <br />b. Date. <br />c. Destination (To:). <br />d. Source (From:). <br />e. Names of subcontractor, manufacturer, and supplier. <br />f. Category and type of submittal. <br />g. Submittal purpose and description. <br />h. Specification Section number and title. <br />1. Drawing number and detail references, as appropriate. <br />J. Transmittal number, numbered consecutively. <br />k. Submittal and transmittal distribution record. <br />1. Remarks. <br />ill. Signature of transmitter. <br /> <br />SUBMITTAL PROCEDURES <br /> <br />01330 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.