My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />3. On an attached separate sheet, prepared on Contractor's letterhead, record relevant <br />information, requests for data, revisions other than those requested by Architect on <br />previous submittals, and deviations from requirements in the Contract Documents, <br />including minor variations and limitations. Include same label information as related <br />submittal. <br /> <br />1. Resubmittals: Make resubmittals in same form and number of copies as initial submittal. <br /> <br />1. Note date and content of previous submittal. <br />2. Note date and content of revision in label or title block and clearly indicate extent of <br />reVISiOn. <br />3. Resubmit submittals until they are marked "No Exceptions Taken" from Architect's <br />action stamp. <br /> <br />J. Distribution: Furnish copies of fInal submittals to manufacturers, subcontractors, suppliers, <br />fabricators, installers, authorities having jurisdiction, and others as necessary for performance of <br />construction activities. Show distribution on transmittal forms. <br />1. Use for Construction: Use only fInal submittals with mark indicating "No Exceptions <br />Taken" from Architect's action stamp. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 <br /> <br />ACTION SUBMITTALS <br /> <br />A. <br /> <br />General: Prepare and submit Action Submittals required by individual SpecifIcation Sections. <br /> <br />1. Submit electronic submittals directly to extranet specifIcally established for Project. <br /> <br />B. Product Data: Collect information into a single submittal for each element of construction and <br />type of product or equipment. <br /> <br />1. If information must be specially prepared for submittal because standard printed data are <br />not suitable for use, submit as Shop Drawings, not as Product Data. <br />2. Mark each copy of each submittal to show which products and options are applicable. <br />3. Include the following information, as applicable: <br /> <br />a. Manufacturer's written recommendations. <br />b. Manufacturer's product specifIcations. <br />c. Manufacturer's installation instructions. <br />d. Standard color charts. <br />e. Manufacturer's catalog cuts. <br />f. Wiring diagrams showing factory-installed wiring. <br />g. Printed performance curves. <br />h. Operational range diagrams. <br />1. Mill reports. <br />J. Standard product operation and maintenance manuals. <br />k. Compliance with specifIed referenced standards. <br />1. Testing by recognized testing agency. <br />m. Application of testing agency labels and seals. <br /> <br />SUBMITTAL PROCEDURES <br /> <br />01330 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.