My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AlA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />n. Notation of coordination requirements. <br /> <br />4. Submit Product Data before or concurrent with Samples. <br />5. Number of Copies: Submit three copies of Product Data, unless otherwise indicated. <br />Architect will return two copies. Mark up and retain one returned copy as a Project <br />Record Document. <br /> <br />C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base <br />Shop Drawings on reproductions of the Contract Documents or standard printed data. <br /> <br />1. Preparation: Fully illustrate requirements in the Contract Documents. Include the <br />following information, as applicable: <br /> <br />a. Dimensions. <br />b. Identification of products. <br />c. Fabrication and installation drawings. <br />d. Roughing-in and setting diagrams. <br />e. Wiring diagrams showing field-installed wmng, including power, signal, and <br />control wiring. <br />f. Shopwork manufacturing instructions. <br />g. Templates and patterns. <br />h. Schedules. <br />1. Design calculations. <br />J. Compliance with specified standards. <br />k. Notation of coordination requirements. <br />L Notation of dimensions established by field measurement. <br />m. Relationship to adjoiniug construction clearly indicated. <br />n. Seal and signature of professional engineer if specified. <br />o. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed <br />wmng. <br /> <br />2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop <br />Drawings on sheets at least 8-1/2 by 11 inches (215 by 280 mm) but no larger than 24 by <br />36 inches. <br />3. Number of Copies: Submit two opaque (bond) copies of each submittal. Architect will <br />return one copy. <br />4. Number of Copies: Submit three opaque copies of each submittal, unless copies are <br />required for operation and maintenance manuals. Submit five copies where copies are <br />required for operation and maintenance manuals. Architect will retain two copies; <br />remainder will be returned. <br /> <br />D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these <br />characteristics with other elements and for a comparison of these characteristics between <br />submittal and actual component as delivered and installed. <br /> <br />1. Transmit Samples that contain multiple, related components such as accessories together <br />in one submittal package. <br />2. Identification: Attach label on unexposed side of Samples that includes the following: <br /> <br />a. Generic description of Sample. <br />b. Product name and name of manufacturer. <br /> <br />SUBMITTAL PROCEDURES <br /> <br />01330 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.