My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AlA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />F. Contractor's Construction Schedule: Comply with requirements specified in Division 1 Section <br />"Construction Progress Documentation" for Construction Manager's action. <br /> <br />G. Submittals Schedule: Comply with requirements specified in Division 1 Section "Construction <br />Progress Documentation." <br /> <br />H. Application for Payment: Comply with requirements specified in Division 1 Section "Payment <br />Procedures. " <br /> <br />1. Schedule of Values: Comply with requirements specified in Division 1 Section "Payment <br />Procedures. " <br /> <br />J. Subcontract List: Prepare a written summary identifying individuals or finns proposed for each <br />portion of the Work, including those who are to furnish products or equipment fabricated to a <br />special design. Use CSI Form 1.5A. Include the following information in tabular form: <br /> <br />1. Name, address, and telephone number of entity performing subcontract or supplying <br />products. <br />2. Number and title of related Specification Section(s) covered by subcontract. <br />3. Drawing number and detail references, as appropriate, covered by subcontract. <br />4. Number of Copies: Submit three copies of subcontractor list, unless otherwise indicated. <br />Architect, through Construction Manager, will return two copies. <br /> <br />a. Mark up and retain one returned copy as a Project Record Document. <br /> <br />K. LEED Submittals: Comply with requirements specified in Division 1 Section "LEED <br />Requirements. " <br /> <br />1. Number of Copies: Submit three copies ofLEED submittals, unless otherwise indicated. <br /> <br />2.2 <br /> <br />INFORMATIONAL SUBMITTALS <br /> <br />A. <br /> <br />General: Prepare and submit Informational Submittals required by other Specification Sections. <br /> <br />1. Number of Copies: Submit two copies of each submittal, unless otherwise indicated. <br />Architect and Construction Manager will not return copies. <br />2. Certificates and Certifications: Provide a notarized statement that includes signature of <br />entity responsible for preparing certification. Certificates and certifications shall be <br />signed by an officer or other individual authorized to sign documents on behalf of that <br />entity. <br />3. Test and Inspection Reports: Comply with requirements specified in Division 1 Section <br />"Quality Requirements." <br /> <br />B. Coordination Drawings: Comply with requirements specified in Division 1 Section "Project <br />Management and Coordination." <br /> <br />C. Contractor's Construction Schedule: Comply with requirements specified in Division 1 Section <br />"Construction Progress Documentation." <br /> <br />SUBMITTAL PROCEDURES <br /> <br />01330 - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.