Laserfiche WebLink
<br />Copyright 2002 AlA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />D. Qualification Data: Prepare written information that demonstrates capabilities and experience <br />of firm or person. Include lists of completed projects with project names and addresses, names <br />and addresses of architects and owners, and other information specified. <br /> <br />E. Welding Certificates: Prepare written certification that welding procedures and personnel <br />comply with requirements in the Contract Documents. Submit record of Welding Procedure <br />Specification (WPS) and Procedure Qualification Record (PQR) on A WS forms. Include <br />names of firms and personnel certified. <br /> <br />F. Installer Certificates: Prepare written statements on manufacturer's letterhead certifying that <br />Installer complies with requirements in the Contract Documents and, where required, is <br />authorized by manufacturer for this specific Proj ect. <br /> <br />G. Manufacturer Certificates: Prepare written statements on manufacturer's letterhead certifying <br />that manufacturer complies with requirements in the Contract Documents. Include evidence of <br />manufacturing experience where required. <br /> <br />H. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that <br />product complies with requirements in the Contract Documents. <br /> <br />L Material Certificates: Prepare written statements on manufacturer's letterhead certifying that <br />material complies with requirements in the Contract Documents. <br /> <br />J. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's <br />standard form, indicating and interpreting test results of material for compliance with <br />requirements in the Contract Documents. <br /> <br />K. Product Test Reports: Prepare written reports indicating current product produced by <br />manufacturer complies with requirements in the Contract Documents. Base reports on <br />evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or <br />on comprehensive tests performed by a qualified testing agency. <br /> <br />L. Research/Evaluation Reports: Prepare written evidence, from a model code organization <br />acceptable to authorities having jurisdiction, that product complies with building code in effect <br />for Project. Include the following information: <br /> <br />1. Name of evaluation organization. <br />2. Date of evaluation. <br />3. Time period when report is in effect. <br />4. Product and manufacturers' names. <br />5. Description of product. <br />6. Test procedures and results. <br />7. Limitations of use. <br /> <br />M. Schedule of Tests and Inspections: Comply with requirements specified in Division 1 Section <br />"Quality Requirements." <br /> <br />N. Preconstruction Test Reports: Prepare reports written by a qualified testing agency, on testing <br />agency's standard form, indicating and interpreting results of tests performed before installation <br />of product, for compliance with performance requirements in the Contract Documents. <br /> <br />SUBMITTAL PROCEDURES <br /> <br />01330 - 8 <br />