My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />SECTION 01500 - TEMPORARY FACILITIES AND CONTROLS <br /> <br />PART 1- GENERAL <br /> <br />1.1 RELATED DOCUMENTS <br /> <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 1 Specification Sections, apply to this Section. <br /> <br />1.2 SUMMARY <br /> <br />A. This Section includes requirements for temporary utilities, support facilities, and security and <br />protection facilities. <br /> <br />B. Related Sections include the following: <br /> <br />1. Division 1 Section "Summary" for limitations on utility interruptions and other work <br />restrictions. <br />2. Division 1 Section "Summary of Multiple Contracts" for division of responsibilities for <br />temporary facilities and controls. <br />3. Division 1 Section "Submittal Procedures" for procedures for submitting copies of <br />implementation and termination schedule and utility reports. <br />4. Division 1 Section "Execution Requirements" for progress cleaning requirements. <br />5. Divisions 2 through 16 Sections for temporary heat, ventilation, and humidity <br />requirements for products in those Sections. <br />6. Division 2 Section "Dewatering" for disposal of ground water at Project site. <br />7. Division 2 Section "Termite Control" for pest control. <br />8. Division 2 Section "Hot-Mix Asphalt Paving" for construction and maintenance of <br />asphalt paving for temporary roads and paved areas. <br />9. Division 2 Section "Cement Concrete Pavement" for construction and maintenance of <br />cement concrete pavement for temporary roads and paved areas. <br /> <br />1.3 DEFINITIONS <br /> <br />A. Permanent Enclosure: As determined by Architect, permanent or temporary roofmg is <br />complete, insulated, and weathertight; exterior walls are insulated and weathertight; and all <br />openings are closed with permanent construction or substantial temporary closures. <br /> <br />1.4 USE CHARGES <br /> <br />A. General: Cost or use charges for temporary facilities shall be included in the Contract Sum. <br />Allow other entities to use temporary services and facilities without cost, including, but not <br />limited to, Owner's construction forces, Architect, occupants of Project, testing agencies, and <br />authorities having jurisdiction. <br /> <br />TEMPORARY FACILITIES AND CONTROLS <br /> <br />01500 - I <br />
The URL can be used to link to this page
Your browser does not support the video tag.