Laserfiche WebLink
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />B. Sewer Service: Pay sewer service use charges for sewer usage by all entities for construction <br />operations. <br /> <br />C. Water Service: Pay water service use charges for water used by all entities for construction <br />operations. <br /> <br />D. Electric Power Service: Pay electric power service use charges for electricity used by all <br />entities for construction operations. <br /> <br />E. Sewer, Water, and Electric Power Service: Use charges are specified in Division I Section <br />"Summary of Multiple Contracts." <br /> <br />F. Water Service: Water from Owner's existing water system is available for use without metering <br />and without payment of use charges. Provide connections and extensions of services as <br />required for construction operations. <br /> <br />G. Electric Power Service: Electric power from Owner's existing system is available for use <br />without metering and without payment of use charges. Provide connections and extensions of <br />services as required for construction operations. <br /> <br />1.5 SUBMITTALS <br /> <br />A. Site Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for <br />construction personnel. <br /> <br />1.6 QUALITY ASSURANCE <br /> <br />A. Electric Service: Comply with NECA, NEMA, and VL standards and regulations for temporary <br />electric service. Install service to comply with NFP A 70. <br /> <br />B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each <br />temporary utility before use. Obtain required certifications and permits. <br /> <br />1.7 PROJECT CONDITIONS <br /> <br />A. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume <br />responsibility for operation, maintenance, and protection of each permanent service during its <br />use as a construction facility before Owner's acceptance, regardless of previously assigned <br />responsibilities. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 <br /> <br />MATERIALS <br /> <br />A. <br /> <br />Pavement: Comply with Division 2. <br /> <br />TEMPORARY FACILITIES AND CONTROLS <br /> <br />01500 - 2 <br />