My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />B. Sewer Service: Pay sewer service use charges for sewer usage by all entities for construction <br />operations. <br /> <br />C. Water Service: Pay water service use charges for water used by all entities for construction <br />operations. <br /> <br />D. Electric Power Service: Pay electric power service use charges for electricity used by all <br />entities for construction operations. <br /> <br />E. Sewer, Water, and Electric Power Service: Use charges are specified in Division I Section <br />"Summary of Multiple Contracts." <br /> <br />F. Water Service: Water from Owner's existing water system is available for use without metering <br />and without payment of use charges. Provide connections and extensions of services as <br />required for construction operations. <br /> <br />G. Electric Power Service: Electric power from Owner's existing system is available for use <br />without metering and without payment of use charges. Provide connections and extensions of <br />services as required for construction operations. <br /> <br />1.5 SUBMITTALS <br /> <br />A. Site Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for <br />construction personnel. <br /> <br />1.6 QUALITY ASSURANCE <br /> <br />A. Electric Service: Comply with NECA, NEMA, and VL standards and regulations for temporary <br />electric service. Install service to comply with NFP A 70. <br /> <br />B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each <br />temporary utility before use. Obtain required certifications and permits. <br /> <br />1.7 PROJECT CONDITIONS <br /> <br />A. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume <br />responsibility for operation, maintenance, and protection of each permanent service during its <br />use as a construction facility before Owner's acceptance, regardless of previously assigned <br />responsibilities. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 <br /> <br />MATERIALS <br /> <br />A. <br /> <br />Pavement: Comply with Division 2. <br /> <br />TEMPORARY FACILITIES AND CONTROLS <br /> <br />01500 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.