Laserfiche WebLink
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />1. Where installations below an outlet might be damaged by spillage or leakage, provide a <br />drip pan of suitable size to lninimize water damage. Drain accumulated water promptly <br />from pans. <br /> <br />E. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of <br />construction personnel. Comply with authorities having jurisdiction for type, number, location, <br />operation, and maintenance of fixtures and facilities. <br /> <br />1. Toilets: Use of Owner's existing toilet facilities will be permitted, as long as facilities are <br />cleaned and maintained in a condition acceptable to Owner. At Substantial Completion, <br />restore these facilities to condition existing before initial use. <br /> <br />F. Heating and Cooling: Provide temporary heating and cooling required by construction activities <br />for curing or drying of completed installations or for protecting installed construction from <br />adverse effects of low temperatures or high humidity. Select equipment that will not have a <br />harmful effect on completed installations or elements being installed. <br /> <br />G. Ventilation and Humidity Control: Provide temporary ventilation required by construction <br />activities for curing or drying of completed installations or for protecting installed construction <br />from adverse effects of high humidity. Select equipment that will not have a harmful effect on <br />completed installations or elements being installed. Coordinate ventilation requirements to <br />produce ambient condition required and minimize energy consumption. <br /> <br />H. Electric Power Service: Use of Owner's existing electric power service will be permitted, as <br />long as equipment is maintained in a condition acceptable to Owner. <br /> <br />I. Electric Power Service: Provide electric power service and distribution system of sufficient <br />size, capacity, and power characteristics required for construction operations. <br /> <br />1. Install electric power service unless otherwise indicated. <br />2. Connect temporary service to Owner's existing power source, as directed by Owner. <br /> <br />J. Lighting: Provide temporary lighting with local switching that provides adequate illumination <br />for construction operations, observations, inspections, and traffic conditions. <br /> <br />1. Install and operate temporary lighting that fulfills security and protection requirements <br />without operating entire system. <br />2. Install lighting for Project identification sign. <br /> <br />K. Telephone Service: Provide temporary telephone service in common-use facilities for use by all <br />construction personnel. Install one telephone line for each field office. <br /> <br />1. At each telephone, post a list of important telephone numbers. <br /> <br />a. Police and fire departments. <br />b. Ambulance service. <br />c. Contractor's home office. <br />d. Architect's office. <br />e. Engineers' offices. <br />f. Owner's office. <br />g. Principal subcontractors' field and home offices. <br /> <br />TEMPORARY FACILITIES AND CONTROLS <br /> <br />01500 - 5 <br />