My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />2. Provide superintendent with cellular telephone or portable two-way radio for use when <br />away from field office. <br /> <br />L. Electronic Communication Service: Provide temporary electronic communication sefV1ce, <br />including electronic mail, in common-use facilities. <br /> <br />1. Provide DSL in primary field office. <br /> <br />3.3 <br /> <br />SUPPORT FACILITIES INSTALLATION <br /> <br />A. <br /> <br />General: Comply with the following: <br /> <br />1. Provide incombustible construction for offices, shops, and sheds located within <br />construction area or within 30 feet (9 m) of building lines. Comply with NFP A 241. <br />2. Maintain support facilities until near Substantial Completion. Remove before Substantial <br />Completion. Pen:onnel remaining after Substantial Completion will be permitted to use <br />permanent facilities, under conditions acceptable to Owner. <br /> <br />B. Temporary Roads and Paved Areas: Construct and maintain temporary roads and paved areas <br />adequate for construction operations. Locate temporary roads and paved areas on Drawings. <br /> <br />1. Provide dust-control treatment that is nonpolluting and nontracking. Reapply treatment <br />as required to minimize dust. <br /> <br />C. Temporary Roads and Paved Areas: Construct and maintain temporary roads and paved areas <br />adequate for constructiotl operations. Locate temporary roads and paved areas in same location <br />as permanent roads and paved areas. Extend temporary roads and paved areas, within <br />construction limits indicated, as necessary for construction operations. <br /> <br />1. Coordinate elevations of temporary roads and paved areas with permanent roads and <br />paved areas. <br />2. Prepare subgrade and install subbase and base for temporary roads and paved areas <br />according to DiviBion 2 Section "Earthwork." <br />3. Recondition bas~: after temporary use, including removing contaminated material, <br />regrading, proofrolling, compacting, and testing. <br />4. Delay installation of final course of permanent hot-mix asphalt pavement until <br />immediately befc)re Substantial Completion. Repair hot-mix asphalt base-course <br />pavement before installation of fInal course according to Division 2 Section "Hot-Mix <br />Asphalt Paving." <br /> <br />D. Traffic Controls: Comply with requirements of authorities having jurisdiction. <br /> <br />1. Protect existing site improvements to remain including curbs, pavement, and utilities. <br />2. Maintain access fc)r fITe-fighting equipment and access to fire hydrants. <br /> <br />E. Parking: Provide temporary parking areas for construction personnel. <br /> <br />F. Dewatering Facilities and Drains: Comply with requirements of authorities having jurisdiction. <br />Maintain Project site, excavations, and construction free of water. <br /> <br />TEMPORARY FACILITIES AND CONTROLS <br /> <br />01500 - 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.