Laserfiche WebLink
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />3.4 <br /> <br />SECURITY AND PROTECTION F ACILITIES INSTALLATION <br /> <br />A. <br /> <br />Environmental Protection: Provide protection, operate temporary facilities, and conduct <br />construction in ways and by methods that comply with environmental regulations and that <br />minimize possible air, waterway, and subsoil contamination or pollution or other undesirable <br />effects. <br /> <br />1. Comply with work restrictions specified in Division 1 Section "Summary." <br /> <br />B. Temporary Erosion and Sedimentation Control: Comply with requirements specified m <br />Division 2 Section "Site Clearing." <br /> <br />C. Temporary Erosion and Sedimentation Control: Provide measures to prevent soil erosion and <br />discharge of soil-bearing water runoff and airborne dust to adjacent properties and walkways, <br />according to requirements of authorities having jurisdiction. <br /> <br />1. Inspect, repair, and maintain erosion- and sedimentation-control measures during <br />construction until permanent vegetation has been established. <br /> <br />D. Stormwater Control: Comply with authorities having jurisdiction. Provide barriers in and <br />around excavations and subgrade construction to prevent flooding by runoff of stormwater from <br />heavy rains. <br /> <br />E. Tree and Plant Protection: Comply with requirements specified in Division 2 Section "Tree <br />Protection and Trimming." <br /> <br />F. Tree and Plant Protection: Install temporary fencing located as indicated or outside the drip line <br />of trees to protect veg€:tation from damage from construction operations. Protect tree root <br />systems from damage, flooding, and erosion. <br /> <br />G. Pest Control: Engage pest-control service to recommend practices to minimize attraction and <br />harboring of rodents, roaches, and other pests and to perform extermination and control <br />procedures at regular intervals so Project will be free of pests and their residues at Substantial <br />Completion. Obtain extended warranty for Owner. Perform control operations lawfully, using <br />environmentally safe materials. <br /> <br />H. Site Enclosure Fence: Before construction operations begin, furnish and install site enclosure <br />fence in a manner that will prevent people and animals from easily entering site except by <br />entrance gates. <br /> <br />1. Extent of Fence: As required to enclose entire Project site or portion determined <br />sufficient to accOlnmodate construction operations. <br />2. Maintain security by limiting number of keys and restricting distribution to authorized <br />personnel. Provide Owner with one set of keys. <br /> <br />I. Security Enclosure and Lockup: Install substantial temporary enclosure around partially <br />completed areas of coru:truction. Provide lockable entrances to prevent unauthorized entrance, <br />vandalism, theft, and similar violations of security. <br /> <br />J. Barricades, Warning Signs, and Lights: Comply with requirements of authorities having <br />jurisdiction for erecting structurally adequate barricades, including warning signs and lighting. <br /> <br />TEMPORARY FACILITIES AND CONTROLS <br /> <br />01500 - 8 <br />