My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />1. Dispose of rainwater in a lawful manner that will not result in flooding Project or <br />adjoining properties nor endanger permanent Work or temporary facilities. <br />2. Remove snow and ice as required to minimize accumulations. <br /> <br />G. Project Identification and Temporary Signs: Provide Project identification and other signs as <br />indicated on Drawings. Install signs where indicated to inform public and individuals seeking <br />entrance to Project. Unauthorized signs are not permitted. <br /> <br />1. Provide temporary, directional signs for construction personnel and visitors. <br />2. Maintain and touchup signs so they are legible at all times. <br /> <br />H. Waste Disposal Facilities: Comply with requirements specified m Division 1 Section <br />"Construction Waste Management." <br /> <br />I. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle <br />waste from construction operations. Comply with requirements of authorities having <br />jurisdiction. Comply with Division 1 Section "Execution Requirements" for progress cleaning <br />requirements. <br /> <br />J. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel. <br /> <br />I. Truck cranes and similar devices used for hoisting materials are considered "tools and <br />equipment" and not temporary facilities. <br /> <br />K. Temporary Elevator Use: Refer to Division 14 Sections for temporary use of new elevators. <br /> <br />L. Existing Elevator Use: Use of Owner's existing elevators will be permitted, as long as elevators <br />are cleaned and maintained in a condition acceptable to Owner. At Substantial Completion, <br />restore elevators to condition existing before initial use, including replacing worn cables, guide <br />shoes, and similar items of limited life. <br /> <br />1. Do not load elevators beyond their rated weight capacity. <br />2. Provide protective coverings, barriers, devices, signs, or other procedures to protect <br />elevator car and entrance doors and frame. If, despite such protection, elevators become <br />damaged, engage elevator Installer to restore damaged work so no evidence remains of <br />correction work. Return items that cannot be refInished in field to the shop, make <br />required repairs and refinish entire unit, or provide new units as required. <br /> <br />M. Temporary Stairs: Until permanent stairs are available, provide temporary stairs where ladders <br />are not adequate. <br /> <br />N. Existing Stair Usage: Use of Owner's existing stairs will be permitted, as long as stairs are <br />cleaned and maintained in a condition acceptable to Owner. At Substantial Completion, restore <br />stairs to condition existing before initial use. <br /> <br />1. Provide protective coverings, barriers, devices, signs, or other procedures to protect stairs <br />and to maintain means of egress. If, despite such protection, stairs become damaged, <br />restore damaged areas so no evidence remains of correction work. <br /> <br />O. Temporary Use of Permanent Stairs: Cover finished, permanent stairs with protective covering <br />of plywood or similar material so fInishes will be undamaged at time of acceptance. <br /> <br />TEMPORARY FACILITIES AND CONTROLS <br /> <br />01500 -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.