My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />Advancement <br />of Construction <br />Technology <br /> <br />SUBSTITUTION <br />REQUEST <br />(After the Bidding Phase) <br /> <br />Project: <br /> <br />Substitution Request Number: <br /> <br />From: <br /> <br />To: <br /> <br />Date: <br /> <br />NE Project Number: <br /> <br />Re: <br /> <br />Contract For: <br /> <br />Specification Title: <br /> <br />Description: <br /> <br />Section: <br /> <br />Page: <br /> <br />ArticlelParagraph: <br /> <br />Proposed Substitution: <br /> <br />Manufacturer: <br /> <br />Address: <br /> <br />Phone: <br /> <br />Trade Name: <br /> <br />Model No.: <br /> <br />Installer: <br /> <br />Address: <br /> <br />Phone: <br /> <br />History: 0 New product 0 2-5 years old 0 5-10 yrs old 0 More than 10 years old <br /> <br />Differences between proposed substitution and specified product: <br /> <br />o Point-by-point comparative data attached - REQUIRED BY NE <br /> <br />Reason for not providing specified item: <br /> <br />Similar Installation: <br /> <br />Project: <br />Address: <br /> <br />Architect: <br /> <br />Owner: <br /> <br />Date Installed: <br /> <br />Proposed substitution affects other parts of Work: <br /> <br />o No 0 Yes; explain <br /> <br />Savings to Owner for accepting substitution: <br />Proposed substitution changes Contract Time: <br /> <br />($ <br /> <br />). <br /> <br />DNo <br /> <br />o Yes [Add] [Deduct] <br /> <br />days. <br /> <br />Supporting Data Attached: 0 Drawings <br /> <br />o Product Data 0 Samples <br /> <br />o Tests <br /> <br />o Reports 0 <br /> <br />Copyright 1996, Construction Specification Institute, <br />60 I Madison Street, Alexandria, VA 22314-1791 <br /> <br />Page of <br /> <br />September 1996 <br />CSI Form 13.1A <br />
The URL can be used to link to this page
Your browser does not support the video tag.