Laserfiche WebLink
<br />SUBSTITUTION <br />REQUEST <br />(Continued) <br /> <br />The Undersigned certifies: <br />. Proposed substitution has been fully investigated and detennined to be equal or superior in all respects to specified product. <br />. Same warranty will be furnished for proposed substitution as for specified product. <br />. Same maintenance service and source of replacement parts, as applicable, is available. <br />. Proposed substitution will have no advers,e effect on other trades and will not affect or delay progress schedule. <br />. Cost data as stated above is complete. Claims for additional costs related to accepted substitution which may subsequently become <br />app~ent~etobewffived. <br />. Proposed substitution does not affect dimensions and functional clearances. <br />. Payment will be made for changes to building design, including NE design, detailing, and construction costs caused by the <br />substitution. <br />. Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects. <br /> <br />Submitted by: <br /> <br />Signed by: <br /> <br />Firm: <br /> <br />Address: <br /> <br />Telephone: <br />Attachments: <br /> <br />NE's REVIEW AND ACTION <br /> <br />D Substitution approved - Make submittals in accordance with Specification Section 01330. <br />D Substitution approved as noted - Make submittals in accordance with Specification Section 01330. <br />D Substitution rejected - Use specified materials. <br />D Substitution Request received too late - USI~ specified materials. <br /> <br />Signed by: <br /> <br />Date: <br /> <br />Additional Comments: <br /> <br />D Contractor <br /> <br />D Subcontractor D Supplier <br /> <br />D Manufacturer D NE D <br /> <br />Copyright 1996, Construction Specification Institutl:, <br />601 Madison Street, Alexandria, VA 22314-1791 <br /> <br />Page of <br /> <br />September 1996 <br />CST Form 13.1A <br />