My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />b. Use product specified if Architect cannot make a decision on use of a comparable <br />product request within time allocated. <br /> <br />D. Basis-of-Design Product Specification Submittal: Comply with requirements in Division 1 <br />Section "Submittal Proc(xiures." Show compliance with requirements. <br /> <br />1.5 QUALITY ASSURANCE <br /> <br />A. Compatibility of Options: If Contractor is given option of selecting between two or more <br />products for use on Project, product selected shall be compatible with products previously <br />selected, even if previou:dy selected products were also options. <br /> <br />1. Each contractor is responsible for providing products and construction methods <br />compatible with products and construction methods of other contractors. <br />2. If a dispute arises between contractors over concurrently selectable but incompatible <br />products, Architect will determine which products shall be used. <br /> <br />1.6 PRODUCT DELIVERY, STORAGE, AND HANDLING <br /> <br />A. Deliver, store, and handle products using means and methods that will prevent damage, <br />deterioration, and loss, including theft. Comply with manufacturer's written instructions. <br /> <br />B. Delivery and Handling: <br /> <br />1. Schedule delivery to mmlilllze long-term storage at Project site and to prevent <br />overcrowding of construction spaces. <br />2. Coordinate delivery with installation time to ensure minimum holding time for items that <br />are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other <br />losses. <br />3. Deliver products to Project site in an undamaged condition in manufacturer's original <br />sealed container or other packaging system, complete with labels and instructions for <br />handling, storing, unpacking, protecting, and installing. <br />4. Inspect products on delivery to ensure compliance with the Contract Documents and to <br />ensure that produets are undamaged and properly protected. <br /> <br />C. Storage: <br /> <br />1. Store products to allow for inspection and measurement of quantity or counting of units. <br />2. Store materials in a manner that will not endanger Project structure. <br />3. Store products that are subject to damage by the elements, under cover in a weathertight <br />enclosure above ground, with ventilation adequate to prevent condensation. <br />4. Store cementitioU8 products and materials on elevated platforms. <br />5. Store foam plastic from exposure to sunlight, except to extent necessary for period of <br />installation and concealment. <br />6. Comply with product manufacturer's written instructions for temperature, humidity, <br />ventilation, and weather-protection requirements for storage. <br />7. Protect stored products from damage and liquids from freezing. <br />8. Provide a secure location and enclosure at Project site for storage of materials and <br />equipment by Owner's construction forces. Coordinate location with Owner. <br /> <br />PRODUCT REQUIREMENTS <br /> <br />01600 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.