My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />SECTION 01700 - EXECUTION REQUIREMENTS <br /> <br />PART 1 - GENERAL <br /> <br />1.1 RELATED DOCUMENTS <br /> <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 1 Specification Sections, apply to this Section. <br /> <br />1.2 SUMMARY <br /> <br />A. This Section includes general procedural requirements govemmg execution of the Work <br />including, but not limited to, the following: <br /> <br />1. Construction layout. <br />2. Field engineering and surveying. <br />3. General installation of products. <br />4. Coordination of Owner-installed products. <br />5. Progress cleaning. <br />6. Starting and adjusting. <br />7. Protection of installed construction. <br />8. Correction of the Work. <br /> <br />B. Related Sections include the following: <br /> <br />1. Division 1 Section "Project Management and Coordination" for procedures for <br />coordinating field engineering with other construction activities. <br />2. Division 1 Section "Submittal Procedures" for submitting surveys. <br />3. Division 1 Section "Cutting and Patching" for procedural requirements for cutting and <br />patching necessary for the installation or performance of other components of the Work. <br />4. Division 1 Section "Closeout Procedures" for submitting final property survey with <br />Project Record Documents, recording of Owner-accepted deviations from indicated lines <br />and levels, and final cleaning. <br /> <br />1.3 SUBMITTALS <br /> <br />A. Qualification Data: For land surveyor. <br /> <br />B. Certificates: Submit certificate signed by land surveyor certifying that location and elevation <br />of improvements comply with requirements. <br /> <br />C. Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed to accept <br />hazardous materials, for hazardous waste disposal. <br /> <br />D. Certified Surveys: Submit two copies signed by surveyor. <br /> <br />E. Final Property Survey: Submit 10 copies showing the Work performed and record survey data. <br /> <br />EXECUTION REQUIREMENTS <br /> <br />01700-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.