My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />1.4 QUALITY ASSURANCE <br /> <br />A. Land Surveyor Qualific~.tions: A professional land surveyor who is legally qualified to practice <br />in jurisdiction where Project is located and who is experienced in providing land-surveying <br />services of the kind indic:ated. <br /> <br />PART 2 - PRODUCTS (Not Used) <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 EXAMINATION <br /> <br />A. Existing Conditions: The existence and location of site improvements, utilities, and other <br />construction indicated as existing are not guaranteed. Before beginning work, investigate and <br />verify the existence and. location of mechanical and electrical systems and other construction <br />affecting the Work. Be:t:Dre construction, verify the location and points of connection of utility <br />sefV1ces <br /> <br />B. Existing Utilities: The existence and location of underground and other utilities and <br />construction indicated as existing are not guaranteed. Before beginning sitework, investigate <br />and verify the existence and location of underground utilities and other construction affecting <br />the Work. <br /> <br />1. Before construction, verify the location and invert elevation at points of connection of <br />sanitary sewer, :;torm sewer, and water-service piping; and underground electrical <br />sefV1ces. <br />2. Furnish location data for work related to Project that must be performed by public <br />utilities serving Pmject site. <br /> <br />C. Acceptance of Conditions: Examine substrates, areas, and conditions, with Installer or <br />Applicator present where indicated, for compliance with requirements for installation tolerances <br />and other conditions affi::cting performance. Record observations. <br /> <br />1. Written Report: Where a written report listing conditions detrimental to performance of <br />the Work is required by other Sections, include the following: <br /> <br />a. Description of the Work. <br />b. List of detrimental conditions, including substrates. <br />c. List of unal;;ceptable installation tolerances. <br />d. Recommended corrections. <br /> <br />2. Verify compatibility with and suitability of substrates, including compatibility with <br />existing fInishes or primers. <br />3. Examine roughing-in for mechanical and electrical systems to verify actual locations of <br />connections before equipment and fixture installation. <br />4. Examine walls, floors, and roofs for suitable conditions where products and systems are <br />to be installed. <br /> <br />EXECUTION REQUIREMENTS <br /> <br />01700 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.