Laserfiche WebLink
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />1.4 QUALITY ASSURANCE <br /> <br />A. Land Surveyor Qualific~.tions: A professional land surveyor who is legally qualified to practice <br />in jurisdiction where Project is located and who is experienced in providing land-surveying <br />services of the kind indic:ated. <br /> <br />PART 2 - PRODUCTS (Not Used) <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 EXAMINATION <br /> <br />A. Existing Conditions: The existence and location of site improvements, utilities, and other <br />construction indicated as existing are not guaranteed. Before beginning work, investigate and <br />verify the existence and. location of mechanical and electrical systems and other construction <br />affecting the Work. Be:t:Dre construction, verify the location and points of connection of utility <br />sefV1ces <br /> <br />B. Existing Utilities: The existence and location of underground and other utilities and <br />construction indicated as existing are not guaranteed. Before beginning sitework, investigate <br />and verify the existence and location of underground utilities and other construction affecting <br />the Work. <br /> <br />1. Before construction, verify the location and invert elevation at points of connection of <br />sanitary sewer, :;torm sewer, and water-service piping; and underground electrical <br />sefV1ces. <br />2. Furnish location data for work related to Project that must be performed by public <br />utilities serving Pmject site. <br /> <br />C. Acceptance of Conditions: Examine substrates, areas, and conditions, with Installer or <br />Applicator present where indicated, for compliance with requirements for installation tolerances <br />and other conditions affi::cting performance. Record observations. <br /> <br />1. Written Report: Where a written report listing conditions detrimental to performance of <br />the Work is required by other Sections, include the following: <br /> <br />a. Description of the Work. <br />b. List of detrimental conditions, including substrates. <br />c. List of unal;;ceptable installation tolerances. <br />d. Recommended corrections. <br /> <br />2. Verify compatibility with and suitability of substrates, including compatibility with <br />existing fInishes or primers. <br />3. Examine roughing-in for mechanical and electrical systems to verify actual locations of <br />connections before equipment and fixture installation. <br />4. Examine walls, floors, and roofs for suitable conditions where products and systems are <br />to be installed. <br /> <br />EXECUTION REQUIREMENTS <br /> <br />01700 - 2 <br />