My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />5. Proceed with installation only after unsatisfactory conditions have been corrected. <br />Proceeding with the Work indicates acceptance of surfaces and conditions. <br /> <br />3.2 PREPARATION <br /> <br />A. Existing Utility Information: Furnish information to local utility that is necessary to adjust, <br />move, or relocate existing utility structures, utility poles, lines, services, or other utility <br />appurtenances located in or affected by construction. Coordinate with authorities having <br />jurisdiction. <br /> <br />B. Field Measurements: Take field measurements as required to fit the Work properly. Recheck <br />measurements before installing each product. Where portions of the Work are indicated to fit to <br />other construction, verify dimensions of other construction by field measurements before <br />fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the <br />Work. <br /> <br />C. Space Requirements: Verify space requirements and dimensions of items shown <br />diagrammatical1y on Drawings. <br /> <br />D. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for <br />clarification of the Contract Documents, submit a request for information to Architect. Include <br />a detailed description of problem encountered, together with recommendations for changing the <br />Contract Documents. Submit requests on CSI Form 13.2A, "Request for Interpretation." <br /> <br />3.3 CONSTRUCTION LAYOUT <br /> <br />A. V erification: Before proceeding to layout the Work, verify layout information shown on <br />Drawings, in relation to the property survey and existing benchmarks. If discrepancies are <br />discovered, notify Architect promptly. <br /> <br />B. General: Engage a land surveyor to layout the Work using accepted surveying practices. <br /> <br />1. Establish benchmarks and control points to set lines and levels at each story of <br />construction and elsewhere as needed to locate each element of Project. <br />2. Establish dimensions within tolerances indicated. Do not scale Drawings to obtain <br />required dimensions. <br />3. Inform installers of lines and levels to which they must comply. <br />4. Check the location, level and plumb, of every major element as the Work progresses. <br />5. Notify Architect when deviations from required lines and levels exceed allowable <br />tolerances. <br />6. Close site surveys with an error of closure equal to or less than the standard established <br />by authorities having jurisdiction. <br /> <br />C. Site Improvements: Locate and layout site improvements, including pavements, grading, fill <br />and topsoil placement, utility slopes, and invert elevations. <br /> <br />D. Building Lines and Levels: Locate and layout control lines and levels for structures, building <br />foundations, column grids, and floor levels, including those required for mechanical and <br /> <br />EXECUTION REQUIREMENTS <br /> <br />01700 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.