My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />3.5 <br /> <br />INSTALLATION <br /> <br />A. <br /> <br />General: Locate the Work and components of the Work accurately, in correct alignment and <br />elevation, as indicated. <br /> <br />I. Make vertical work plumb and make horizontal work level. <br />2. Where space is limited, install components to maximize space available for maintenance <br />and ease of removal for replacement. <br />3. Conceal pipes, ducts, and wiring in fInished areas, unless otherwise indicated. <br />4. Maintain minimum headroom clearance of [8 feet (2.4 m)] in spaces without a suspended <br />ceiling. <br /> <br />B. Comply with manufacturer's written instructions and recommendations for installing products in <br />applications indicated. <br /> <br />C. Install products at the time and under conditions that will ensure the best possible results. <br />Maintain conditions required for product performance until Substantial Completion. <br /> <br />D. Conduct construction operations so no part of the Work is subjected to damaging operations or <br />loading in excess of that expected during normal conditions of occupancy. <br /> <br />E. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels. <br /> <br />F. Templates: Obtain and distribute to the parties involved templates for work specified to be <br />factory prepared and field installed. Check Shop Drawings of other work to confIrm that <br />adequate provisions are made for locating and installing products to comply with indicated <br />requirements. <br /> <br />G. Anchors and Fasteners: Provide anchors and fasteners as required to anchor each component <br />securely in place, accurately located and aligned with other portions of the Work. <br /> <br />1. Mounting Heights: Where mounting heights are not indicated, mount components at <br />heights directed by Architect. <br />2. Allow for building movement, including thermal expansion and contraction. <br />3. Coordinate installation of anchorages. Furnish setting drawings, templates, and <br />directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and <br />items with integral anchors, that are to be embedded in concrete or masonry. Deliver <br />such items to Project site in time for installation. <br /> <br />H. <br /> <br />Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, <br />arrange joints for the best visual effect. Fit exposed connections together to form hairline joints. <br /> <br />I. <br /> <br />Hazardous Materials: Use products, cleaners, and installation materials that are not considered <br />hazardous. <br /> <br />3.6 <br /> <br />OWNER-INSTALLED PRODUCTS <br /> <br />A. <br /> <br />Site Access: Provide access to Project site for Owner's construction forces. <br /> <br />EXECUTION REQUIREMENTS <br /> <br />01700 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.