My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />B. Coordination: Coordinate construction and operations of the Work with work performed by <br />Owner's construction forces. <br /> <br />1. Construction Sch~:dule: Inform Owner of Contractor's preferred construction schedule <br />for Owner's portion of the Work. Adjust construction schedule based on a mutually <br />agreeable timetable. Notify Owner if changes to schedule are required due to differences <br />in actual construction progress. <br />2. Preinstallation Conferences: Include Owner's construction forces at preinstallation <br />conferences covering portions of the Work that are to receive Owner's work. Attend <br />preinstallation conferences conducted by Owner's construction forces if portions of the <br />Work depend on Owner's construction. <br /> <br />3.7 <br /> <br />PROGRESS CLEANING <br /> <br />A. <br /> <br />General: Clean Project site and work areas daily, including common areas. Coordinate <br />progress cleaning for joint-use areas where more than one installer has worked. Enforce <br />requirements strictly. Dispose of materials lawfully. <br /> <br />1. Comply with requirements in NFP A 241 for removal of combustible waste materials and <br />debris. <br />2. Do not hold materials more than 7 days during normal weather or 3 days if the <br />temperature is expected to rise above 80 deg F (27 dcg C). <br />3. Containerize hazardous and unsanitary waste materials separately from other waste. <br />Mark containers appropriately and dispose of legally, according to regulations. <br /> <br />B. Site: Maintain Project site free of waste materials and debris. <br /> <br />C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for <br />proper execution of the Work. <br /> <br />1. Remove liquid spills promptly. <br />2. Where dust would impair proper execution of the Work, broom-clean or vacuum the <br />entire work area, as appropriate. <br /> <br />D. Installed Work: Keep installed work clean. Clean installed surfaces according to written <br />instructions of manufaclturer or fabricator of product installed, using only cleaning materials <br />specifically recommended. If specific cleaning materials are not recommended, use cleaning <br />materials that are not hazardous to health or property and that will not damage exposed surfaces. <br /> <br />E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space. <br /> <br />F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure <br />freedom from damage and deterioration at time of Substantial Completion. <br /> <br />G. Waste Disposal: Burying or burning waste materials on-site will not be permitted. Washing <br />waste materials down sewers or into waterways will not be permitted. <br /> <br />H. During handling and installation, clean and protect construction in progress and adjoining <br />materials already in place. Apply protective covering where required to ensure protection from <br />damage or deterioration at Substantial Completion. <br /> <br />EXECUTION REQUIREMENTS <br /> <br />01700 - 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.