My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11 /02 <br /> <br />I. Clean and provide maintenance on completed construction as frequently as necessary through <br />the remainder of the construction period. Adjust and lubricate operable components to ensure <br />operability without damaging effects. <br /> <br />J. Limiting Exposures: Supervise construction operations to assure that no part of the <br />construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise <br />deleterious exposure during the construction period. <br /> <br />3.8 STARTING AND ADJUSTING <br /> <br />3.9 <br /> <br />3.10 <br /> <br />A. <br /> <br />Start equipment and operating components to confIrm proper operation. <br />malfunctioning units, replace with new units, and retest. <br /> <br />Remove <br /> <br />B. <br /> <br />Adjust operating components for proper operation without binding. Adjust equipment for <br />proper operation. <br /> <br />C. <br /> <br />Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. <br />Replace damaged and malfunctioning controls and equipment. <br /> <br />D. <br /> <br />Manufacturer's Field Service: If a factory-authorized service representative is required to <br />inspect field-assembled components and equipment installation, comply with qualification <br />requirements in Division 1 Section "Quality Requirements." <br /> <br />PROTECTION OF INSTALLED CONSTRUCTION <br /> <br />A. <br /> <br />Provide fmal protection and maintain conditions that ensure installed Work is without damage <br />or deterioration at time of Substantial Completion. <br /> <br />B. <br /> <br />Comply with manufacturer's written instructions for temperature and relative humidity. <br /> <br />CORRECTION OF THE WORK <br /> <br />A. <br /> <br />Repair or remove and replace defective construction. Restore damaged substrates and fInishes. <br />Comply with requirements in Division 1 Section "Cutting and Patching." <br /> <br />1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up <br />with matching materials, and properly adjusting operating equipment. <br /> <br />B. Restore permanent facilities used during construction to their specified condition. <br /> <br />C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired <br />without visible evidence of repair. <br /> <br />D. Repair components that do not operate properly. Remove and replace operating components <br />that cannot be repaired. <br /> <br />E. Remove and replace chipped, scratched, and broken glass or reflective surfaces. <br /> <br />EXECUTION REQUIREMENTS <br /> <br />01700 -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.