My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />3. Concrete: Cut using a cutting machine, such as an abrasive saw or a diamond-core drill. <br />4. Excavating and Backfilling: Comply with requirements in applicable Division 2 Sections <br />where required by cutting and patching operations. <br />5. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be <br />removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent <br />entrance of moisture or other foreign matter after cutting. <br />6. Proceed with patching after construction operations requiring cutting are complete. <br /> <br />C. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations <br />following performance of other Work. Patch with durable seams that are as invisible as <br />possible. Provide matl~rials and comply with installation requirements specified in other <br />Sections. <br /> <br />1. Inspection: Where feasible, test and inspect patched areas after completion to <br />demonstrate integrity of installation. <br />2. Exposed Finishe!i: Restore exposed finishes of patched areas and extend fInish <br />restoration into retained adjoining construction in a manner that will eliminate evidence <br />of patching and refinishing. <br /> <br />a. Clean piping, conduit, and similar features before applying paint or other fInishing <br />materials. <br />b. Restore damaged pipe covering to its original condition. <br /> <br />3. Floors and Walls: Where walls or partitions that are removed extend one fInished area <br />into another, patch and repair floor and wall surfaces in the new space. Provide an even <br />surface of unifoml fInish, color, texture, and appearance. Remove in-place floor and wall <br />coverings and replace with new materials, if necessary, to achieve uniform color and <br />appearance. <br /> <br />a. Where patc:hing occurs in a painted surface, apply primer and intermediate paint <br />coats over the patch and apply fmal paint coat over entire unbroken surface <br />containing the patch. Provide additional coats until patch blends with adjacent <br />surfaces. <br /> <br />4. Ceilings: Patch, repair, or rehang in-place ceilings as necessary to provide an even-plane <br />surface of unifoml appearance. <br />5. Exterior Building Enclosure: Patch components in a manner that restores enclosure to a <br />weathertight condition. <br /> <br />D. Cleaning: Clean areas and spaces where cutting and patching are performed. Completely <br />remove paint, mortar, oils, putty, and similar materials. <br /> <br />END OF SECTION 01731 END OF SECTION 01731 <br /> <br />CUITING AND PATCHING <br /> <br />01 731 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.