Laserfiche WebLink
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />2.4 MISCELLANEOUS RECORD SUBMITTALS <br /> <br />A. Assemble miscellaneous records required by other Specification Sections for miscellaneous <br />record keeping and submittal in connection with actual performance of the Work. Bind or file <br />miscellaneous records and identify each, ready for continued use and reference. <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 RECORDING AND MAINTENANCE <br /> <br />A. Recording: Maintain one copy of each submittal during the construction period for Project <br />Record Document purposes. Post changes and modifications to Project Record Documents as <br />they occur; do not wait until the end of Project. <br /> <br />B. Maintenance of Record Documents and Samples: Store Record Documents and Samples in the <br />field office apart from the Contract Documents used for construction. Do not use Project <br />Record Documents for construction purposes. Maintain Record Documents in good order and <br />in a clean, dry, legible condition, protected from deterioration and loss. Provide access to <br />Project Record Documents for Architect's and Construction Manager's reference during normal <br />working hours. <br /> <br />END OF SECTION 01781 <br /> <br />PROJECT RECORD DOCUMENTS <br /> <br />01781 - 5 <br />