My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC Short Form <br /> <br />08/02 (R 05/06) <br /> <br />3. Medium: Generally expose coarse aggregate; with slight reveal, a maximum of 1/4 inch <br />(6 mm). <br />4. Heavy: Expose .md reveal coarse aggregate to a maximum projection of one-third its <br />diameter; with reveal range of 1/4 to 1/2 inch (6 to 13 nun). <br /> <br />H. Bushhammer Finish: Allow concrete to cure at least 14 days before starting bushhammer <br />surface fmish operations. <br /> <br />1. Surface Continuity: Perform bushhammer fmishing in as continuous an operation as <br />possible, maintaining continuity of finish on each surface or area of Work. Maintain <br />required patterns Dr variances of cut as shown on Drawings or to match design reference <br />sample or mockup. <br />2. Surface Cut: Maintain required depth of cut and general aggregate exposure. <br /> <br />3.7 CONCRETE CURING <br /> <br />A. Begin curing cast-in-place architectural concrete immediately after [removing forms from] <br />[applying as-cast formled finishes to] concrete. Cure according to ACI 308.1, by one or a <br />combination of [moisture curing] [moisture-retaining-cover curing] [curing compound] <br />methods that will not mottle, discolor, or stain concrete: <br /> <br />3.8 FIELD QUALITY COl'irTROL <br /> <br />A. General: Comply with Division 3 Section "Cast-in-Place Concrete" for field quality-control <br />requirements. <br /> <br />3.9 REPAIRS AND PROTECTION <br /> <br />A. Repair and cure damaged fmished surfaces of cast-in-place architectural concrete when <br />approved by Architect. Match repairs to color, texture, and uniformity of surrounding surfaces <br />and to repairs on approved mockups. <br /> <br />1. Remove and replace cast-in-place architectural concrete that cannot be repaired and cured <br />to Architect's approval. <br /> <br />B. Protect comers, edges, and surfaces of cast-in-place architectural concrete from damage; use <br />guards and barricades. <br /> <br />C. Protect cast-in-place architectural concrete from staining, laitance, and contamination during <br />remainder of construction period. <br /> <br />END OF SECTION 03331END OF SECTION 03331 <br /> <br />CAST-IN-PLACE ARCIDTECTURAL CONCRETE <br /> <br />03331 - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.