My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2005 AIA <br /> <br />MASTERSPEC Short Form <br /> <br />02/05 (R 05/06) <br /> <br />G. At bolted connections, use lock washers, tack welding, or other approved means to prevent <br />loosening of nuts after final adjustment. <br /> <br />H. Grouting: Grout connections and joints and open spaces at keyways, connections, and joints <br />where required or indic:ated on Shop Drawings. Retain grout in place until hard enough to <br />support itself. Pack spaees with stiff grout material, tamping until voids are completely filled. <br /> <br />3.2 ERECTION TOLERANCES <br /> <br />A. Erect precast structural concrete units level, plumb, square, true, and in alignment without <br />exceeding the noncumulative erection tolerances of PC I MNL 135. <br /> <br />B. Minimize variations between adjacent slab members by jacking, loading, or other method <br />recommended by fabricator and approved by Architect. <br /> <br />3.3 FIELD QUALITY C01\TROL <br /> <br />A. Special Inspections: [Owner will engage] [Engage] a qualified special inspector to perform <br />the following special inspections: <br /> <br />1. Erection of preca8t structural concrete members. <br />2. <Insert special inspections>. <br /> <br />B. Testing Agency: [Owner will engage] [Engage] a qualified testing agency to perform tests and <br />inspections. <br /> <br />C. Field welds will be visually inspected and nondestructive tested according to ASTM E 165 or <br />ASTM E 709. High-stnmgth bolted connections will be subject to inspections. <br /> <br />D. Testing agency will report test results promptly and in writing to Contractor and Architect. <br /> <br />E. Repair or remove and nplace work where tests and inspections indicate that it does not comply <br />with specified requirem(mts. <br /> <br />F. Additional testing and inspecting, at Contractor's expense, will be performed to deter1nine <br />compliance of replaced or additional work with specified requirements. <br /> <br />G. Prepare test and inspection reports. <br /> <br />3.4 REPAIRS <br /> <br />A. Repair precast structural concrete units if permitted by Architect. <br /> <br />1. Repairs may be permitted if structural adequacy, serviceability, durability, and <br />appearance of units has not been impaired. <br /> <br />B. Mix patching material~; and repair units so cured patches blend with color, texture, and <br />uniformity of adjacent exposed surfaces and show no apparent line of demarcation between <br /> <br />PLANT -PRECAST STRUCTUR<\L CONCRETE <br /> <br />03410 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.