My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2005 AIA <br /> <br />MASTERSPEC Short Form <br /> <br />02/05 (R 05/06) <br /> <br />2.13 <br /> <br />indentations, minor chips, and spalls are permitted. Major imperfections, honeycombing, or <br />defects are not permitted. <br /> <br />F. <br /> <br />Smooth, steel trowel fmish unformed surfaces. Consolidate concrete, bring to proper level with <br />straightedge, float, and trowel to a smooth, uniform fmish. <br /> <br />G. <br /> <br />Apply roughened surface fmish according to ACI 318 (AeI 318M) to precast concrete units that <br />will receive concrete topping after installation. <br /> <br />SOURCE QUALITY CONTROL <br /> <br />A. <br /> <br />Testing: Test and inspect precast structural concrete according to PCI MNL 116 requirements. <br /> <br />B. <br /> <br />Defective Units: Discard and replace precast structural concrete units that do not comply with <br />requirements, including strength, manufacturing tolerances, and color and texture range. <br />Chipped, spall ed, or cracked units may be repaired, subject to Architect's approval. Architect <br />reserves the right to reject precast units that do not match approved samples, sample panels, and <br />mockups. <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 <br /> <br />INSTALLATION <br /> <br />A. <br /> <br />Install clips, hangers, bearing pads, and other accessories required for connecting precast <br />structural concrete units to supporting members and backup materials. <br /> <br />B. <br /> <br />Erect precast structural concrete level, plumb, and square within specified allowable tolerances. <br />Provide temporary structural framing, supports, and bracing as required to maintain position, <br />stability, and alignment of units until permanent connection. <br /> <br />I. Maintain horizontal and vertical joint alignment and uniform joint width as erection <br />progresses. <br />2. Remove projecting lifting devices and grout fill voids within recessed lifting devices <br />flush with surface of adjacent precast surfaces when recess is exposed. <br />3. For hollow-core slab voids used as electrical raceways or mechanical ducts, align voids <br />between units and tape butt joint at end of slabs. <br /> <br />C. Connect precast structural concrete units in position by bolting, welding, grouting, or as <br />otherwise indicated on Shop Drawings. Remove temporary shims, wedges, and spacers as soon <br />as practical after connecting and grouting are completed. <br /> <br />D. Field cutting of precast units is not permitted without approval ofthe Architect. <br /> <br />E. Fasteners: Do not use drilled or powder-actuated fasteners for attaching accessory items to <br />precast, prestressed concrete units. <br /> <br />F. Welding: Comply with applicable AWS D1.1/Dl.IM and AWS Dl.4 for welding, welding <br />electrodes, appearance, quality of welds, and methods used in correcting welding work. <br /> <br />PLANT -PRECAST STRUCTURAL CONCRETE <br /> <br />03410 - 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.