Laserfiche WebLink
<br />Copyright 2003 AIA <br /> <br />MASTERSPEC Short Form <br /> <br />05103 (R 05/06) <br /> <br />L. Floor-Deck Closures: Weld steel sheet column closures, cell closures, and Z-closures to deck, <br />according to SDI recommendations, to provide tight-fitting closures at open ends of ribs and <br />sides of deck. <br /> <br />3.2 FIELD QUALITY CONTROL <br /> <br />A. Testing Agency: [Owner will engage] [Engage] a qualified independent testing and inspecting <br />agency to perform field tests and inspections and prepare test reports. <br /> <br />B. Field welds will be subject to inspection. <br /> <br />C. Testing agency will report inspection results promptly and m writing to Contractor and <br />Architect. <br /> <br />D. Remove and replace work that does not comply with specified requirements. <br /> <br />E. Additional inspecting, at Contractor's expense, will be performed to determine compliance of <br />corrected work with specified requirements. <br /> <br />3.3 REJ>AIRS <br /> <br />A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on both surfaces of deck <br />with galvanized repair paint according to ASTM A 780 and manufacturer's written instructions. <br /> <br />B. Repair Painting: Wire brush and clean rust spots, welds, and abraded areas on [hoth surfaces] <br />[top surface] of prime-painted deck immediately after installation, and apply repair paint. <br /> <br />END OF SECTION 0531 OEND OF SECTION 05310 <br /> <br />STEEL DECK <br /> <br />05310-6 <br />