My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-10-01) Streetscape Improvements
>
Specifications
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 4:33:06 PM
Creation date
4/12/2011 4:32:38 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Streetscape Improvements
Bid No. (xx-xx-xx)
08-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. Maintain and protect planting, including incidental materials, until end of <br />maintenance period. <br /> <br />G. Bracing of palms shall remain in place and its removal shall be the responsibility <br />of the City. <br /> <br />3.03 FINISH SUBGRADE <br /> <br />A. Upon acceptance of the rough grading, establish fine sub-grade with smooth and <br />even finish. Remove all rocks more than one inch diameter, sticks, debris and <br />vegetation to a depth of six inches. Final sub-grade shall be established as <br />herein specified. Depths are relative to the elevation of the top of curb. <br /> <br />3.04 SHIPMENT AND DELIVERY <br /> <br />A. Notify the CONSULTANT a minimum of 2 (two) working days in advance of when <br />plant material is to be delivered. <br /> <br />B. Plant material shall be protected from weather, adequately packed to prevent <br />breakage and drying out during transit. The use of anti-transparent, in <br />compliance with the manufacturer's specification, is encouraged. <br /> <br />C. Plants shall not be planted on job until they have been inspected at receiving site <br />and accepted by Consultant. <br /> <br />D. Plants which show improper handling, bruised trunks, broken branches or root <br />balls or arrive on site in an unsatisfactory condition will be rejected. <br /> <br />E. Acceptance of plant material will be given by the Consultant only after the <br />material is planted and after meeting all of the incidental requirements <br />prescribed herein and on the plans. <br /> <br />3.05 PLANTING TREES <br /> <br />A. General <br /> <br />1. Locate and mark proposed positions of all plants or plant beds with stakes. <br />Before digging, notify Consultant for review and acceptance or possible <br />relocation. <br /> <br />2. If location indicated on planting drawings cannot be used, other locations shall <br />be chosen, subject to approval by Consultant. <br /> <br />3. Coordinate with site lighting, irrigation, paving, piping, electrical and other <br />related site work. <br /> <br />B. Excavation: <br /> <br />1. Excavations identified as having potential utility or service line conflicts <br />shall be excavated by hand tools to determine the location of any utilities <br />that may otherwise be damaged by excavation. <br /> <br />2. Excavate tree and palm pits as necessary to accommodate root balls of <br /> <br />PAGE 123 OF 130 <br />BID No. 08-10-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.