Laserfiche WebLink
<br />SECTION 37 <br />CLOSE OUT DOCUMENTS <br /> <br />Contractor shall provide at the minimum the following documents at the completion of the Project: <br /> <br />1. 1- Copy signed and sealed of material test reports, including 28 day breaks for concrete. <br /> <br />"2. 5 - Paper copies of the Project "As Built" Survey prepared in CAD format, signed and sealed <br />by a licensed surveyor registered in the State of Florida. <br /> <br />3. 1 CAD disk of the "As Built Survey" in AutoCAD 2005 or newer. Scan disks are not allowed. <br /> <br />4. Operating manual, parts lists and warranties for equipment installed. <br /> <br />5. Final inspection release from the Building Department for all irrigation and electrical <br />equipment installed. <br /> <br />6. Release of lien from all subcontractors and materialmen. <br /> <br />7. Release from surety for final payment. <br /> <br />8. Final release of lien from the Contractor. <br /> <br />9. Completion of all punch list items <br /> <br />10. Acceptance by all permitting and interested agencies <br /> <br />PAGE 100 OF 130 <br />BID No. 08-10-01 <br />