My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-10-01) Streetscape Improvements
>
Specifications
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 4:33:06 PM
Creation date
4/12/2011 4:32:38 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Streetscape Improvements
Bid No. (xx-xx-xx)
08-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTION 37 <br />CLOSE OUT DOCUMENTS <br /> <br />Contractor shall provide at the minimum the following documents at the completion of the Project: <br /> <br />1. 1- Copy signed and sealed of material test reports, including 28 day breaks for concrete. <br /> <br />"2. 5 - Paper copies of the Project "As Built" Survey prepared in CAD format, signed and sealed <br />by a licensed surveyor registered in the State of Florida. <br /> <br />3. 1 CAD disk of the "As Built Survey" in AutoCAD 2005 or newer. Scan disks are not allowed. <br /> <br />4. Operating manual, parts lists and warranties for equipment installed. <br /> <br />5. Final inspection release from the Building Department for all irrigation and electrical <br />equipment installed. <br /> <br />6. Release of lien from all subcontractors and materialmen. <br /> <br />7. Release from surety for final payment. <br /> <br />8. Final release of lien from the Contractor. <br /> <br />9. Completion of all punch list items <br /> <br />10. Acceptance by all permitting and interested agencies <br /> <br />PAGE 100 OF 130 <br />BID No. 08-10-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.