Laserfiche WebLink
<br />SECTION 36 <br />FACILITY TESTING <br /> <br />36.1 field Tests: As soon as conditions permit, the Contractor shall furnish all labor, materials, and <br />instruments and shall perform field tests of installed items. If the field tests disclose any item of Work <br />under this contract which does not comply with the requirements of the contract documents the <br />Contractor shall, prior to the acceptance testing or continuation of portions or the Work as determined by <br />the Consultant, make all changes, adjustments, and replacements required. Water, sanitary sewer and <br />storm drainage improvements constructed under this contract will be subject to, at a minimum, the <br />following tests: <br /> <br />36.2 final field Tests: Upon completion of the Work and prior to final payment, all items of Work <br />under this contract shall be subject to acceptance tests as specified or required by the Consultant to <br />comply with the contract documents. The Contractor shall furnish labor, fuel, energy and all other <br />materials, equipment and instruments necessary for all acceptance tests, at no additional cost to the City. <br /> <br />END OF SECTION <br /> <br />PAGE 99 OF 130 <br />BID No. 08-10-01 <br />