Laserfiche WebLink
<br /> <br /> <br /> <br />Question 9 Statement of experience summarizing projects constructed under a similar development <br />process. <br /> <br />~ Current Builders has completed in excess of 4000 parking spaces for both public and private Owners in <br />design-build, design-bid-build and CM @ Risk contracts. See section 7 for detailed information on <br />relevant projects. <br /> <br />~ Current Builders recently completed a very similar parking structure to the proposed garage where it <br />required us to build the structure while contiguous buildings were being built. We have developed a <br />unique forming system that does not require large staging areas thus allowing for work to commence <br />earlier on areas outside the building footprint such as the proposed park. See the attached preliminary <br />schedule under section 8. <br /> <br />~ Listed below under Our Approach you will note that we have selected a team that includes a park- <br />hardscape specialist. On a completed similar project, Current Builders was constructing a 585 space <br />garage while Burkhart was performing streetscape improvements as part of the master development in <br />Boynton Beach. Our recent success working together proves our teaming ability. <br /> <br />~ The vast historical data collected over many years enables us to provide value engineering to the Owners <br />selecting systems and material in collaboration with the design professionals that provide the most benefit <br />to the Owner. <br /> <br />Question 9 continued. What can the firm "bring to the table" for the benefit of the City of Sunny Isles <br />Beach. <br /> <br />~ Building Information Modeling: We are one of the few builders that have adopted this new 3D computer <br />generated modeling technology which limits change orders and RFl's while reducing construction time <br />periods which results in savings to the Owner. We have compiled comparative studies on the R.O.I using <br />B.I.M. and the results are impressive. They are so impressive we can cap costs associated with plan <br />coordination deficiencies. <br /> <br />~ In House Structural Capabilities: Of additional significance, the City of Sunny Isles will rely on the <br />selected builder to have a thorough understanding of the most critical part of the building Le. the <br />structure. Our team has significant experience through our in house CB Structures division where we can <br />self perform many of our structures. Having recently completed a nearly identical parking garage structure <br />we have the resources and knowledge to perform quickly and safely while creating cost savings to the <br />Owner by potentially keeping the structure in-house. <br /> <br />~ Our Management Team: Our team will be lead by William Blackledge who is a 25 year veteran at CB <br />and also is a Principal. William's large project experience includes notable projects such as the 45 million <br />dollar Marina Village mixed use project which included an 846 space design build garage. Aaron Buttress <br />will lead as CB's Project Manager and is a LEED AP. Aaron has managed four garages totaling over <br />1,655 spaces. He will lead a team with over eighty years experience in the construction industry. See the <br />organizational chart under section 5 for our other team members. <br /> <br />~ Our Approach: At the pre-submittal conference a question was asked Q# 9. At this point, it is a single <br />project, both phases, correct? A. Correct, obviously these two phases don't necessarily make the <br />perfect match, typically park builders are not parking garage builders. We agree with the answer <br />and have teamed with Burkhart Construction whose expertise is working with Municipal Owners on their <br /> <br />14 I P age <br />