Laserfiche WebLink
<br /> <br /> <br /> <br />r <br /> <br />hardscape projects. Coupled with our expertise in garages we can focus on our respective strengths and <br />deliver it seamlessly. We have worked alongside Burkhart in the past with successful results. <br /> <br />~ Sustainability and Durability: We understand your desire to make the building as green as possible. <br />Our proposed project manager has recently completed a gold certified office building with a standalone <br />garage. Additionally all Current Builders project managers are required to be LEED certified to assist in <br />the green building process. Having completed three design-build garages of similar design we understand <br />the material choices and quality standards that will be required to protect a long term asset. <br /> <br />~ Quality Control: Current Builders Quality Control process dictates that every project has a unique <br />quality control plan based on internal guidelines, construction methodology and owner requirements. In <br />using the establish processes, the Quality Control manager creates a project specific quality control plan, <br />which includes project specific inspection checklists, frequency and type of testing required, as well as the <br />scheduling of third party consultants. In support of the site specific quality control plan, Current Builders <br />supervisory field staff is trained in the use of the software quality control program, with reports monitored <br />and reviewed by the Quality Control Manager. <br /> <br />~ Safety: Our safety culture has been recognized on the National, State and Local levels. Current Builders <br />is a founding partner in the Florida CHASE (Construction Health and Safety Excellence) program, a <br />partnership between OSHA, AGC and member contractors. We have been granted SHARP (Safety and <br />Health Achievement Recognition Program) status after a rigorous acceptance process. SHARP is an <br />OSHA partnership that recognizes employers who operate an exemplary safety and health management <br />system. Acceptance into SHARP by OSHA is an achievement of status that singled out Current Builders <br />among our business peers as a model for worksite safety and health. Current Builders is only one of a <br />handful of General Contractors in the Florida who have attained this status. <br /> <br />Question 10 A statement addressing the firms present and projected workload and how this project will <br />be scheduled within that workload. <br /> <br />~ Current Builders present value of construction is $103,000,000.00 with a backlog of 10,000,000.00. Our <br />surety credit limit with Travelers is in excess of $150,000,000.00 which indicates $140,000,000.00 of <br />surety credit available. <br /> <br />~ Our projected workload by midyear is expected to be $65,000,000 with a similar backlog which would <br />allow for $85,000,000.00 in additional capacity. <br /> <br />~ Our project staffing availability is very similar to our available surety credit meaning at the present time we <br />have a more than sufficient staff to handle this and other projects. <br /> <br />~ The proposed staff in the organizational chart exemplifies the excellent talent that has been assembled <br />for this project. <br /> <br />~ Excellent resources are available in the marketplace due to inactivity in the marketplace and we are <br />confident that our long term association with many of the vendors, suppliers and subcontractors that we <br />can assemble a highly competent team. <br /> <br />15 I P age <br />