Laserfiche WebLink
<br /> <br />8) Evidence of capabilities for construction scheduling, material <br />procurement, and assurance that plans, specifications, and <br />schedules are rnet. <br />During the construction of your project, our team has several <br />software program options, Primavera SureTrak or Microsoft <br />Project, depending on the preference of the client. These state-of- <br />the-art software programs allow complete control of scheduling <br />including critical path, resource management, cost loading <br />control, management graphics and cost reports. Further project <br />organization enhancements by phase, responsibility and crew <br />sizing are available and used on our projects. <br /> <br />Schedules are developed on Primavera SureTraklMicrosoft Project <br />and custom software from historical data of similar projects with <br />input from trade contractors, tempered for geographic location, <br />market conditions and Owner/End User time constraints and <br />input from the facility that the work will be performed on. <br />Scheduling shut downs, hours of operation, "quiet times" and <br />other facility specific dates are identified up front and considered <br />when preparing the schedule in preconstruction. Master schedules, <br />updated monthly, and mini two week "look-ahead" schedules, <br />updated weekly, are routine for all projects. <br /> <br />The W.G. Mills team will use this computer-based schedule control <br />system at the project site to ensure that updates and schedule <br />reports can be accessed as necessary. Our schedule control <br />system provides the printed schedule reports and computer <br />plotted network diagrams used by the project team so that its <br />trade contractors, suppliers, Owner and Architect will know the <br />exact status of the project along with present and future needs. <br /> <br /> <br />Scheduling controls utilized are: <br />· Project master schedule <br /> <br />· Design/review/bid/award schedules <br /> <br />· Pre-bid construction schedules <br /> <br />· Detailed construction schedules <br /> <br />· Short interval work schedules <br /> <br />All of these schedules will be developed at the job site using <br />computer-based CPM scheduling technology. Important features <br />of this technology are that it incorporates a resource-loading <br />capability and produces plotter-driven graphics in both network <br />and bar chart formats. <br /> <br />During the construction phase the schedule is maintainedl <br />updated as necessary to keep the project on schedule. Some <br />projects under difficult constraints will be updated as often as <br />daily while most require weekly updates. Once a schedule has <br />been developed and committed to by all parties, we ask to be <br />given the authority to enforce the agreements. There are many <br />types of computer-based scheduling aids available that we use, <br />but the key is commitment and follow-through by the parties <br />making the decisions and performing the work. <br /> <br />-'. <br /> <br />In concert with Primavera SureTrak and Microsoft Project, our <br />team utilizes the Prolog Manager Project Control Software. <br />Prolog Manager represents a new breed of construction software <br />that was designed to be utilized by construction superintendents, <br />construction managers, project managers, project engineers or <br />project support staff. <br /> <br />Prolog Manager can calculate the actual start and finish dates, <br />the actual duration, the remaining duration and the percentage <br />completed for each CPM task. This information is exported back <br />to Primavera to update the project schedule. This provides two <br />benefits to the project: <br />. Enhances daily work description documentation <br /> <br />. Provides a quick and simple update of schedules, creates <br />fresh as-built schedules. <br /> <br />Prolog Manager eliminates many tedious hours of manually <br />tracking the daily details of a construction project. In addition <br />to saving time, Prolog Manager reports project information <br />in a wide variety of ways to help manage the project. Prolog <br />Manager is utilized to record and manage an enormous amount <br />of daily construction project information: <br />. Comprehensive project budget information <br /> <br />. Prime contract, subcontract and design consultant <br />contracts <br /> <br />. Purchase orders and a purchase order catalogue <br />of frequently bought items <br /> <br />. Proposed change orders including notifications of <br />changes to an owner and request for proposals <br /> <br />. Change order requests that allow you to submit and <br />track multiple proposed change orders simultaneously <br /> <br />. Prime contract change orders that are linked to the <br />prime contract <br /> <br />. Subcontract change orders that are linked to the <br />corresponding su bcontracts <br /> <br />. Professional supplemental service agreements linked to <br />the corresponding designerlconsultant contract <br /> <br />. Contract invoices for monthly billings <br /> <br />· General (supplier or vendor) invoices <br /> <br />. Applications for payment....and other items which can <br />be discussed later with a Team representative. <br /> <br />Coordination of subcontract scheduling information begins prior <br />to construction. Each subcontractor is interviewed with respect <br />to the project schedule covering the following issues: <br />1. Start date for subcontractor's scope of work. <br />2. Submittal requirements and specific timing on each. <br />3. Equipment and material fabrication and timing. <br />4. Anticipated manpower and production rates. <br />5. Quality assurance and inspection requirements. <br />6. Sequence requirements including the scheduled timing, <br />material needs and equipment delivery. <br /> <br />Scheduling updates and detailed information is discussed with <br />the subcontractor on a weekly basis during job site meetings, and <br />the discussion documented in action oriented meeting minutes. <br /> <br />We coordinate construction scheduling through a combination <br />of our subcontractor meetings prior to construction with our <br />weekly scheduling updates. The Superintendent and Project <br />Manager review the results of the weekly meetings and take the <br />action steps they determine necessary. <br /> <br />~ Response to The City of Sunny Isles Beach RFQ No. 09-03-01 <br />~ Professional Construction Services for Heritage Park and Parking Garage <br />~"'.' ,.- ,.- <br /> <br />submitted by IIJ] WG Mills <br />Wo" Ha'd//BU;~ Right' <br />