My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WG Mills
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
Responses
>
WG Mills
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2011 4:43:46 PM
Creation date
4/25/2011 4:43:41 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />budget; all construction costs will be analyzed on a systems basis <br />to allow careful consideration of potential trade-offs to maintain <br />budget requirements.. <br /> <br />As the design of the project progresses, the Mills Team will begin <br />a series of estimates at several milestone points. These estimates <br />are compared to the budget to determine overages or savings. <br />All estimates are evaluated and analyzed in sufficient detail to <br />facilitate decisions that result in maintaining the overall costs at <br />budget level. All team members will be provided a copy of all <br />estimates in sufficient detail for review. <br /> <br />PROCUREMENT <br />Although not normally recognized as Cost Control, the <br />completeness, clarity and accuracy of the information used <br />for bidding construction is a key element of an overall cost <br />management program. The information included on the drawings, <br />specifications and requirements of the contract, insurance <br />program, special conditions, schedule, site logistics and bid form <br />are what bidders base their pricing on. If the information is too <br />rigorous, the pricing will be higher. If the information is lacking <br />completeness or detail, pricing will be unrealistically low initially, <br />only to be raised to a point that is unrealistically high when the <br />final requirements are realized. <br /> <br />Through drawing reviews, pre-bid package reviews, and <br />development of bid package components that are realistic from <br />an owner and a building point of view, we will be controlling the <br />project's cost. <br /> <br />VALUE ENGINEERING/LIFE CYCLE COST ANALYSIS <br />Value Engineering/Life Cycle Cost Analysis is a systematic <br />approach to maximizing the effect of every dollar spent. <br />Essentially, this process evaluates alternative materials and <br />methods to maintain a specific level of performance and <br />design intent but at a lower cost. For the your project, we will <br />conduct an aggressive value analysis, construction feasibility, <br />considerations relative to labor and material availability and <br />effect on the project schedule, operating cost and the efficiency <br />of staffing cost. <br /> <br />Value Engineering benefits are realized when this process <br />is applied as early in the design phase as possible. This will <br />allow the entire team input with every major design decision, <br />effectively eliminating the need for "after-the-fact" design <br />revisions, emergency cost-cutting and unexpected cost overruns. <br />As design progresses, our value engineering focus will adjust <br />from predominantly system review during schematic design to <br />configuration and interrelationships during design development <br />and product selection during the construction documents phase. <br /> <br />COST TRACKI NG <br />Cost tracking is a process of providing a clear audit trail on costs <br />from the first construction cost estimate through project buy-out. <br />Each succeeding estimate will be organized in accordance with <br />the established format to track costs as design proceeds. <br /> <br />The W.G. Mills Team's estimating and cost tracking system <br />is capable of handling thousands of cost items providing the <br />management information needed to track overall project costs <br />on a daily basis. <br /> <br />The Project Manager is the key link in our cost control program. <br />He maintains computer tracking of the following: <br /> <br />Work-In-Place - The cost to complete each category of work on <br />a project is re-estimated monthly. <br /> <br />Productivity - Data for labor productivity report preparation. <br /> <br />Cash Flow - A detailed outline of both short-term and long-term <br />future cash requirements provided to aid our clients in their own <br />cash management for the duration of the construction activities. <br /> <br />Budget Overruns - Project Managers use computer generated <br />reports of both labor productivity and materials. Overruns and <br />underruns by cost code are developed and compiled and used as <br />the basis for project forecasting. <br /> <br />Percentage of Project Completed - The percentage of project <br />completed for each category of labor is developed as a by-product <br />of the weekly payroll system and the work-in-place report system. <br />For subcontract work, the percentage completed is calculated for <br />each category of work. <br /> <br />9) A statement of experience summarizing projects constructed <br />under a similar development process and a summary of what the <br />Firm can "bring to the table" for the benefit of the City of Sunny Isles <br />Beach. <br />W.G. Mills, Inc. is the right choice for this project and will <br />best service the needs of this project and of the City of Sunny <br />Isles Beach. We have an unparalleled commitment to quality <br />construction and client satisfaction as evidenced by our track <br />record over the last 36 years. During this time we have <br />completed over $1.1 billion in projects under the Construction <br />Management delivery process, $1.0 billion in projects under the <br />General Contracting (bid) delivery process and $63 million under <br />the Design/Build delivery process. We take pride in the fact that <br />we have a repeat client following of 80%, with the remaining <br />20% representing new clients. <br /> <br />W.G. Mills, Inc. is a leader in the park and parking garage <br />construction industry. An excellent example of this is the fact <br />that we have been awarded three (3) consecutive park projects by <br />the City of Tampa. Two (2) of these, Cotanchobee Park and the <br />South Riverwalk Plaza, are showcase projects and centerpieces <br />of the City's waterfront District. Our continued quality and <br />timely deliveries have again led to repeat business from a satisfied <br />client. <br /> <br />The specific team proposed for this project is compromised of <br />a premier group of construction professionals with combined <br />experience of over $2.5 billion is successful construction <br />deliveries. The core team, compromised of Project Manager <br />Josh Christensen and Superintendent Kevin Foster, have been <br />working in tandem for the last 10 years. During this period, they <br />have successfully delivered over $200 million in construction <br />projects, including two (2) high schools (with full recreational <br />and competition athletic facilities), two (2) elementary schools <br />(with full recreational facilities), one (1) middle school (with <br />full recreational facilities), and two (2) golf clubhouses. They <br />are currently completing a $65 million high school in Brevard <br />County and the client satisfaction on that project is beyond <br />compare. These individuals will be servicing the project and the <br /> <br />~ Response to The City of Sunny Isles Beach RFQ No. 09-03-01 <br />~ Professional Construction Services for Heritage Park and Parking Garage <br />~"'., .~_.- <br /> <br />submitted by IIJ] WG Mills <br />Wo,k Ha'd//BUI~ Right' <br />
The URL can be used to link to this page
Your browser does not support the video tag.