Laserfiche WebLink
<br />Town of Miami Lakes Entry Features <br />Tina Rivera <br />15700 NW 67th Avenue <br />Miami Lakes, Florida 33014 <br />(305) 364 6100 <br />SITE Design Group, Inc. has designed the The Orlando Skate Park <br /> <br />'l <br />') <br />, <br />~ <br />') <br />!") <br />f) <br />o <br />() <br />') <br />~) <br />() <br />a <br />...... <br />,. <br />..., <br />., <br /> <br />() <br />......... <br />,. <br />. <br /> <br />City of Lighthouse Point <br />4730 NE 21 Terrace <br />Lighthouse Point, Florida 33064 <br />Telephone: 954-946-7386 <br />Fax: 954-946-7932 <br /> <br />SSG Development and Construction <br />651 Washington Street, Suite 200 <br />Brookline, MA 02446 <br />Direct: 617.938.6489 <br />Office: 617.938.6478 x 201 <br />Cell: 508.864.8168 <br />Fax: 617.278.1552 <br /> <br />,.... <br />.. <br />...... <br />.. <br />....... <br />.. <br />......... <br />,. <br />....... <br />..... <br /> <br />. <br />) <br />:t <br />() <br />() <br />() <br />() <br />a <br />() <br />() <br /> <br />doneil@ssgdevelopment.com <br /> <br />'PSE PIOS & SONS <br />_ Sunny Isles, Florida <br />n:t 'NI (3051919 9662 <br /> <br />References <br /> <br />I Description of Services: New construction of landscaped street closures <br />consisting of excavation, curbing, sidewalk, pavers and landscaped areas. <br />Also various concrete projects throughout the City including Handrail <br />installation, Guard Rail, and Concrete Bridge Repair. <br /> <br />Contract Amount: Exceeds over $450,000 <br />Prime Contractor <br />May, 2005 to October 2009 <br /> <br />Description of Services: New Construction and site development of Self <br />Storage facility: Paving, drainage, concrete, water, stripping and signage of <br />outside area of new Self Storage Facility Located at: SW 8th Street and 67th <br />A venue, Miami, FL <br />Contract Amount $599,000.00 <br />Prime Contractor <br />May, 2009 to October 2009 <br /> <br />Description of Services: New Construction and site development of Self <br />Storage facility: Paving, drainage, concrete, stripping and signage of outside <br />area of new Self Storage Facility Located at: SW 272 Street and US-l in <br />Naranga, Florida <br />Contract Amount $450,000.00 <br />Prime Contractor <br />August, 2009 to Ongoing <br /> <br />Description of Services: Installation of Four Town Entry Features. Concrete <br />work, Fountain, electrical, plumbing, drainage. <br /> <br />Contract Amount $256,000.00 <br />Prime Contractor <br />April, 2008 to October 2009 <br /> <br />most progressive facilities with integrated The Berkeley Skate Park <br />site planning solutions, and meeting the Escondido Skate Park <br />needs of several cities. Their NlKE Skate Park <br />professionally recognized, award winning Tony Hawk Skate Park <br />skate park designs throughout the United Descriptions and Narratives can be provided upon request. <br />States includes the following: <br /> <br />~, <br />,. <br />"'l <br />i) <br />'1 <br />:l <br />') <br />..... <br />~ <br />) <br />~ <br />1",,\ <br /> <br />Plos and Sons Enterprises, Inc. <br />320 Atlantic Avenue, Sunny Isles, FL 33160 <br />OFFICE: (305) 919-9662 FAX: (305) 819-4222 PIOS@BELLSOUTH.NET <br />