My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-05-01 Bella Vista Bay Park Improvements
>
Addendums
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2011 1:53:05 PM
Creation date
6/17/2011 1:53:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Bella Vista Park Improvements
Bid No. (xx-xx-xx)
11-05-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5. Can we just write our price on letterhead in our proposals? <br />The actual RFP will tell you how to break out your submittal, your proposal, and the <br />price just incorporate it wherever the RFP states. It is pretty straight forward. <br /> <br />6. Do you recommend a vendor? <br />We used AES in one of our projects, they have an assortment of pre-cast structures. <br />He believes that AES is the recommended vendor but again, you submit the shops. We <br />will review it and depending on that we will make a decision. <br /> <br />7. What is the duration of the project? <br />It may be in the body of the RFP but he typically does not place a timeframe on it <br />because of the Selection Process. If someone proposes to do it in a shorter period of <br />time then there is an advantage to that, we let you all take a look at it and depending on <br />how you visualize your availability and your subs availability and how you coordinate, <br />that will determine it. You need to incorporate in the body of the RFP how long it is <br />going to take for you to complete this project. We typically ask for, but we don't <br />require, a little construction schedule of sorts, but as long as you say how long it is <br />going to take you, we are good. <br /> <br />8. It says in the RFP 60 days. <br />We are not going to do the 60 days, we will allow you to formulate your own <br />construction schedule. He does ask that you consider the time restraints because that is <br />one of the items that he is going to look at to determine who is going to be the vendor. <br />And there is a couple of long-lead items in there and 60 days is cutting it close because <br />you have the standing seam metal roof and the pre-cast that has to be done and those <br />two elements alone have a fairly long-lead item, some are eight weeks, some are ten <br />weeks depending on who you are getting it from. <br /> <br />9. The only environmental agency you have applied to is DERM? <br />Yes, we considered Army Corp of Engineers and the Coast Guard, however he is <br />leaving that in everyone's capable hands. The presumption was if he submitted it to <br />DERM, that DERM would say you need to go to Army Corp of Engineers, etc., they <br />have not told him that. <br /> <br />10. Then DERM has not given you the Completion Summary? <br />No, and that is going to be key. He is hoping to get it before you all submit so that you <br />will have an idea as to what is going to be required as part of that Class 2. <br /> <br />11. Is the City going to have a standard contract form? <br />Yes, we have a standard contract form. The contract will be done when we select a <br />vendor and we send a form to you. <br /> <br />12. Has there been a dry run? <br />Yes, and we did an internal for Sunny Isles Beach, and we have incorporated all the <br />comments back into the plan. We currently have a permit application with DERM and <br />we are waiting for their response, we sent it about a month ago and they have 60 days <br />to review. <br /> <br />11-05-01 Pre-Submittal Conference Qi\ 051811 <br /> <br />Page 3 of 4 <br />